Building consents
Residential building consents in Ōkaihau
Below: 89 residential consents we hold in Ōkaihau, searchable and on the map.
Residential consents on record in Ōkaihau
Individual building consents we hold, each on its property: 89 from 1 Jul 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions18
4 in the last 12 months · typically $33k
- Fires and heating17
3 in the last 12 months · typically $3,000
- Multiple homes5
5 in the last 12 months · typically $776k
- Garages, sheds and carports4
1 in the last 12 months · typically $103k
- New homes4
1 in the last 12 months · typically $385k
- Minor dwellings and sleepouts3
typically $120k
- Relocated buildings2
1 in the last 12 months · typically $95k
- Plumbing, drainage and wastewater2
typically $19k
- Repairs, recladding and strengthening1
typically $50k
- Pools and spas1
typically $89k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $4mRbw- block e (unit 58-88)- proposed superstructure for 4 block unit houses, works included are foundation, retaining wall, load bearing/ bracing walls, midfloor, flooring, beams & support, bracings, t 111 Settlers Way, Ōkaihau
- $776kRbw - block e4 - lots 81-88 - architecture consent only for 8 two storey terrace units, 2 bdrm, 1-bathrm, 1 toilet, laundry & opening living space at ground floor 111 Settlers Way, Ōkaihau
- $776kRbw - block e3 - lots 73-80 - architecture consent only for 8 two storey terrace units, 2 bdrm, 1-bathrm, 1 toilet, laundry & opening living space at ground floor. 111 Settlers Way, Ōkaihau
- $776kRbw - block e2 - lots 65-72 - architecture consent only for 8 two storey terrace units, 2 bdrm, 1-bathrm, 1 toilet, laundry & opening living space at ground floor 111 Settlers Way, Ōkaihau
- $678kRbw - block e1 - lots 58-64 - architecture consent only for 7 two storey terrace units, 2 bdrm, 1-bathrm, 1 toilet, laundry & opening living space at ground floor. 111 Settlers Way, Ōkaihau
89 consents
- Alterations and additions$60k
New timber pile foundations & was
- Fires and heating$7,500
Install freestanding woodburner
- Alterations and additions$11k
Fire installation & wetback
- Alterations and additions$6,000
Install of a maxen kinmont 450 wood
- Fires and heating$1,200
Install metro wee rad base wood bur
- Multiple homes$678k
Rbw - block e1 - lots 58-64 - architecture consent only for 7 two storey terrace units, 2 bdrm, 1-bathrm, 1 toilet, laundry & opening living space at ground floor.
- Multiple homes$776k
Rbw - block e2 - lots 65-72 - architecture consent only for 8 two storey terrace units, 2 bdrm, 1-bathrm, 1 toilet, laundry & opening living space at ground floor
- Multiple homes$776k
Rbw - block e3 - lots 73-80 - architecture consent only for 8 two storey terrace units, 2 bdrm, 1-bathrm, 1 toilet, laundry & opening living space at ground floor.
- Multiple homes$776k
Rbw - block e4 - lots 81-88 - architecture consent only for 8 two storey terrace units, 2 bdrm, 1-bathrm, 1 toilet, laundry & opening living space at ground floor
- Fires and heating$5,000
Installations of new wood burner fi
- Alterations and additions$30k
Alt to res building for Oranga Tamariki - passive fire & emergency lighting upgrades - approved under section 112(2)
- Relocated buildings$90k
Relocate second hand dwg to site
- New homes$300k
New building including a 2 bdrm
- Garages, sheds and carports$110k
Proposed new gge
- Multiple homes$4m
Rbw- block e (unit 58-88)- proposed superstructure for 4 block unit houses, works included are foundation, retaining wall, load bearing/ bracing walls, midfloor, flooring, beams & support, bracings, t
- Minor dwellings and sleepouts$10k
Proposed sleepout has an additional
- Alterations and additions$6,500
Installation of a jayline fr300 woo
- Alterations and additions$60k
Exterior & interior alterations t
- Alterations and additions$5,000
Installation of new blaze king sirocco 20 pen onto steel ash hearth, no previous fire
- Plumbing, drainage and wastewater$20k
Install on-site wastewater system
- Alterations and additions$60k
Install inground fibreglass swimmin
- Alterations and additions$5,000
Installation of an additional trenc
- Fires and heating$3,000
Install of a masport r1200 ped free
- New homes$370k
Prefabricated Dwg
- Garages, sheds and carports$33k
Construct a versatile 1000 series gge
ResidentialCommercial The dots are this page of the list.
Suburbs in Ōkaihau
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.