Building consents
Building consents in Te Kiri
Below: 5 consents we hold in Te Kiri, searchable and on the map.
Consents on record in Te Kiri
Individual building consents we hold, each on its property: 5 from 1 Jul 2021 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating2
typically $7,250
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $12k
- Multiple homes1
1 in the last 12 months · typically $2.2m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.2mRbw - construction of four detached two-storey dwgs with retaining walls. Lots 1, 3 & 4 include four bedrooms, 2.5 bathrooms, & a single internal gge; lot 2 includes five bedrooms, three b 20 Lower Kiri Road
- $12kCertificate of acceptance: plumbing & drainage to facilities for buildings constructed under schedule 1 2685 Eltham Road
5 consents
- Multiple homes$2.2m
Rbw - construction of four detached two-storey dwgs with retaining walls. Lots 1, 3 & 4 include four bedrooms, 2.5 bathrooms, & a single internal gge; lot 2 includes five bedrooms, three b
- Plumbing, drainage and wastewater$12k
Certificate of acceptance: plumbing & drainage to facilities for buildings constructed under schedule 1
- Fires and heating$7,000
Install metro smart insert fire into existing brick cavity in the lounge area of the home
- Fires and heating$7,500
Install metro xtreme rad (leg) freestanding logfire with wetback
- Fires and heating$1,950
Install metro ca xtreme rad- legs f/stdg logfire
ResidentialCommercial The dots are this page of the list.
Near Te Kiri
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.