Building consents
Building consents in Heyward Point
Below: 7 consents we hold in Heyward Point, searchable and on the map.
Consents on record in Heyward Point
Individual building consents we hold, each on its property: 7 from 1 Nov 2019 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating2
typically $5,750
- New homes1
1 in the last 12 months · typically $1.5m
- Alterations and additions1
typically $50k
- Plumbing, drainage and wastewater1
typically $16k
- Minor dwellings and sleepouts1
typically $400k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.5mNew dwg with attached gge, install 3x solid fuel burners, 5x water tanks, septic system & erect shed 171 Whareakeake Road
7 consents
- New homes$1.5m
New dwg with attached gge, install 3x solid fuel burners, 5x water tanks, septic system & erect shed
- Minor dwellings and sleepouts$400k
Alt dwg, install warmington studio stove & warmington si 1100 heaters, erect deck & construct block wall
- Fires and heating$6,500
Installation of fireestanding solid fuel heater - Hurunui ped
- Plumbing, drainage and wastewater$16k
Amendment to ABA-2023-1620 - install septic tank & effluent dispersal field
- Alterations and additions$50k
Alt dwg - install beam, enlarge & alt bathrm layout (wet-area shower) & install toilet & install homewood stove heritage heater
- Fires and heating$5,000
Install hunter herald 80b heater in dwg
- Fires and heating$6,000
Install masport r1200 leg heater in dwg
ResidentialCommercial The dots are this page of the list.
Near Heyward Point
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.