Building consents

Building consents in Long Beach

Below: 12 consents we hold in Long Beach, searchable and on the map.

Consents we hold123 in the last 12 monthsSearch them ↓

Consents on record in Long Beach

Individual building consents we hold, each on its property: 12 from 1 Dec 2020 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating4

    1 in the last 12 months · typically $6,000

  2. Alterations and additions3

    typically $10k

  3. Plumbing, drainage and wastewater2

    1 in the last 12 months · typically $18k

  4. Minor dwellings and sleepouts1

    1 in the last 12 months · typically $1,000

  5. Multiple homes1

    typically $4m

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01122202420252026November 2023: 0December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 0June 2024: 1July 2024: 1August 2024: 1September 2024: 0October 2024: 0November 2024: 0December 2024: 0January 2025: 0February 2025: 0March 2025: 0April 2025: 0May 2025: 1June 2025: 0July 2025: 0August 2025: 1September 2025: 0October 2025: 0November 2025: 0December 2025: 0January 2026: 0February 2026: 0March 2026: 2April 2026: 0May 2026: 0June 2026: 1July 2026: 0August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $20kReplace septic tank with effluent dispersal field 11 Driver Street
  2. $5,000Install maxen kinmont 350-w heater in dwg 47 Driver Street
  3. $1,000Install solid fuel burner in sleepout 65 Driver Street

12 consents

  1. Minor dwellings and sleepouts$1,000

    Install solid fuel burner in sleepout

    65 Driver Street · 1 Jun 2026 · 666/26

  2. Fires and heating$5,000

    Install maxen kinmont 350-w heater in dwg

    47 Driver Street · 1 Mar 2026 · 186/26

  3. Plumbing, drainage and wastewater$20k

    Replace septic tank with effluent dispersal field

    11 Driver Street · 1 Mar 2026 · 197/26

  4. Alterations and additions$450k

    Rbw - additions & alterations to existing dwg. Demolition or existing building & sheds, new 2 storey add & alt to existing dwg. New gge, workshop, 4 bedrooms, kitchen, dinin

    82 Beach Road · 1 Aug 2025 · BCO10397095

  5. Fires and heating$7,500

    Free standing woodsman Brunner mkii solid fuel heater

    22 Beach Road · 1 May 2025 · BC250394

  6. Plumbing, drainage and wastewater$16k

    Install septic tank with effluent dispersal field

    6 Baird Street · 1 Aug 2024 · 949/24

  7. Alterations and additions$4,999

    DBC RBW amendment to BCO10334530 proposed fire egress door.

    80 Beach Road · 1 Jul 2024 · BCO10334530-A

  8. Alterations and additions$10k

    Change of use for an ancillary building constructed under exemption to habitable detached res dwgs.

    2 Beach Road · 1 Jun 2024 · BC230269

  9. Multiple homes$4m

    Rbw - proposed 6x3 storey multi-unit on front of site & 4x3 storey townhouses to the rear of the site. Units contain 1 or 2 bedrooms & townhouses contain 3 or four bedrooms. One detention tank for each townhouse. Retaining walls.

    8 Baird Street · 1 Jul 2023 · BCO10347973

  10. Fires and heating$6,000

    Install metro xtreme rad heater in dwg

    50 Driver Street · 1 Sep 2022 · 1870/22

  11. Fires and heating$6,000

    Install pyroclassic mini freestanding heater in dwg

    23 Driver Street · 1 Mar 2022 · 295/22

  12. Fires and heating$5,400

    Remove heater & install masport f3000 heater in dwg

    63 Driver Street · 1 Dec 2020 · 2778/20

ResidentialCommercial The dots are this page of the list.

Near Long Beach

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Dunedin City Council.