Building consents
Building consents in Longwood
Below: 11 consents we hold in Longwood, searchable and on the map.
Consents on record in Longwood
Individual building consents we hold, each on its property: 11 from 1 Sep 2019 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes3
typically $580k
- Commercial alterations1
1 in the last 12 months · typically $300k
- New commercial buildings1
1 in the last 12 months · typically $850k
- Farm buildings1
typically $40k
- Fires and heating1
typically $6,000
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $850k1-bdrm dwg with media room & office space 347 Orepuki Riverton Highway
- $300kAdd of granny flat: resiting a standalone pourakino 1-bed unit (previously consented for a different lot) to function as a bdrm, office, & ensuite. 25 Aparima Street
11 consents
- Commercial alterations$300k
Add of granny flat: resiting a standalone pourakino 1-bed unit (previously consented for a different lot) to function as a bdrm, office, & ensuite.
- New commercial buildings$850k
1-bdrm dwg with media room & office space
- New homes$580k
New 4 bdrm dwg with dbl gge 212m2
- Farm buildings$40k
New implement shed - to be used as new gge according to site plan
- New homes$300k
Rectangular 1-bdrm dwg using sips with gable roof & overhanging eaves, uPVC windows (recessed installation), MVHR.
- New homes$900k
Rectangular 3-bdrm dwg using sips with gable roof & overhanging eaves, upvc windows (recessed installation), mvhr.
- Fires and heating$6,000
Install new hhf stag fire & flue
- Alterations and additions$1
Amendment - window sizes altered, lintels & bracing revised as needed
- Fires and heating$4,000
Install new metro LTD mega rad.
- Alterations and additions$30k
Enclosure over part of existing patio. Timber framed walls with plywood cladding. Timber framed roof with 'suntuf' roof cladding
- Fires and heating$3,000
Install jayline fr400 free standing wood burner on to ash hearth
ResidentialCommercial The dots are this page of the list.
Near Longwood
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.