Building consents

Residential building consents in Longwood

Below: 8 residential consents we hold in Longwood, searchable and on the map.

Consents we hold8Search them ↓

Residential consents on record in Longwood

Individual building consents we hold, each on its property: 8 from 1 Sep 2019 to 1 Mar 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. New homes3

    typically $580k

  2. Fires and heating1

    typically $6,000

Consents on record by month

The last three years. A recent dip is often records still to arrive.

00111202420252026November 2023: 1December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 1May 2024: 0June 2024: 0July 2024: 0August 2024: 0September 2024: 0October 2024: 0November 2024: 0December 2024: 0January 2025: 0February 2025: 0March 2025: 1April 2025: 0May 2025: 0June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 0December 2025: 0January 2026: 0February 2026: 0March 2026: 0April 2026: 0May 2026: 0June 2026: 0July 2026: 0August 2026: 0September 2026: 0October 2026: 0

8 consents

  1. New homes$580k

    New 4 bdrm dwg with dbl gge 212m2

    10 Longwood Road · 1 Mar 2025 · RBW/2025/201519/1

  2. New homes$300k

    Rectangular 1-bdrm dwg using sips with gable roof & overhanging eaves, uPVC windows (recessed installation), MVHR.

    35 Estuary Street · 1 Apr 2024 · RBW/2023/201031/1

  3. New homes$900k

    Rectangular 3-bdrm dwg using sips with gable roof & overhanging eaves, upvc windows (recessed installation), mvhr.

    · 1 Nov 2023 · RBW/2023/201030/1

  4. Fires and heating$6,000

    Install new hhf stag fire & flue

    139 Longwood Road · 1 Sep 2022 · BLD/2022/301460/1

  5. Alterations and additions$1

    Amendment - window sizes altered, lintels & bracing revised as needed

    66 Longwood Road · 1 Aug 2021 · RBW/2021/200217/2

  6. Fires and heating$4,000

    Install new metro LTD mega rad.

    80A Blackmore Road · 1 Nov 2020 · BLD/2020/300353/1

  7. Alterations and additions$30k

    Enclosure over part of existing patio. Timber framed walls with plywood cladding. Timber framed roof with 'suntuf' roof cladding

    77 Tihaka Beach Road · 1 Mar 2020 · RBW/2020/102385/1

  8. Fires and heating$3,000

    Install jayline fr400 free standing wood burner on to ash hearth

    98A Longwood Road · 1 Sep 2019 · BLD/2019/53115/1

ResidentialCommercial The dots are this page of the list.

Near Longwood

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.