Below: 61 consents we hold in Tihiotonga, searchable and on the map.
Consents on record in Tihiotonga
Individual building consents we hold, each on its property: 61 from 1 Jul 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes17
1 in the last 12 months · typically $380k
- Alterations and additions15
3 in the last 12 months · typically $20k
- Garages, sheds and carports6
typically $20k
- Fires and heating3
typically $5,000
- Decks, pergolas and verandahs2
typically $26k
- Retaining walls1
typically $15k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $900k3x transportable, 2 bdrm domestic dwg 12 Henare Place
- $20kUnit 1 to be amended to an accessible unit for public access 12 Henare Place
- $10kReplacing existing shower with new tiled shower 16 Exeter Place
- $5,000Amendment - add of 4 skylights. 12 Henare Place
61 consents
- Alterations and additions$10k
Replacing existing shower with new tiled shower
- Alterations and additions$5,000
Amendment - add of 4 skylights.
- Alterations and additions$20k
Unit 1 to be amended to an accessible unit for public access
- New homes$900k
3x transportable, 2 bdrm domestic dwg
- New homes$680k
Construction of new transportable 3 bdrm dwg
- New homes$450k
Construction of new transportable 3 bdrm dwg
- New homes$444k
Transportable, 3 bdrm domestic dwg
- New homes$320k
Construction of 4 x new transportable 1 bdrm domestic
- New homes$426k
Construction of new transportable 4 bdrm dwg
- New homes$290k
Construction of new transportable 3 bdrm dwg
- New homes$417k
Construction of new transportable 3 bdrm dwg
- New homes$417k
Construction of new transportable 3 bdrm dwg
- New homes$290k
Construction of new transportable 3 bdrm dwg
- New homes$258k
Construction of new transportable 3 bdrm dwg
- Alterations and additions$8,000
Install shower in existing bathrm
- New homes$290k
Construction of new transportable 3 bdrm dwg
- New homes$417k
Construction of new transportable 3 bdrm dwg
- Fires and heating$15k
Block retaining wall, enclose gge, two carports, & install metro woodburner
- Garages, sheds and carports$60k
New gge
- Alterations and additions$30k
Bathrm alterations
- Alterations and additions$20k
Bathrm alterations
- New homes$330k
Construction of new transportable 3 bdrm dwg
- Alterations and additions$1,000
Install grinder pump, remove rab, bracing change
- Alterations and additions$1,000
VB20 batten removed from truss areas
- Decks, pergolas and verandahs$1,000
Add 4x 550x1400 fixed skylights to verandah.
ResidentialCommercial The dots are this page of the list.
Near Tihiotonga
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.