Building consents
Building consents in Utuhina
Below: 102 consents we hold in Utuhina, searchable and on the map.
Consents on record in Utuhina
Individual building consents we hold, each on its property: 102 from 1 Jul 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes13
4 in the last 12 months · typically $550k
- Alterations and additions12
1 in the last 12 months · typically $14k
- Fires and heating11
2 in the last 12 months · typically $5,500
- Garages, sheds and carports6
1 in the last 12 months · typically $60k
- Repairs, recladding and strengthening2
1 in the last 12 months · typically $63k
- Decks, pergolas and verandahs2
1 in the last 12 months · typically $28k
- Multiple homes2
typically $1.2m
- Minor dwellings and sleepouts2
typically $18k
- Plumbing, drainage and wastewater2
typically $14k
- Relocated buildings1
1 in the last 12 months · typically $200k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.4mRbw / pbc e2e - 6x new 2 storey dwgs. Lots 1-4 are duplexes, each with 3 bedrooms, 2.5 bathrooms & new retaining wall. Lots 5-6 are standalone, each with 3 bedrooms, 2.5 bathrooms, single gge 1 La Trobe Place
- $900k3 bdrm single level home 10 Uta Street
- $675k4 bdrm single level dwg 8 Uta Street
- $450kNew dwg 13A Corlett Street
- $200kRelocatable home 3 La Trobe Place
102 consents
- New homes$1.4m
Rbw / pbc e2e - 6x new 2 storey dwgs. Lots 1-4 are duplexes, each with 3 bedrooms, 2.5 bathrooms & new retaining wall. Lots 5-6 are standalone, each with 3 bedrooms, 2.5 bathrooms, single gge
- Garages, sheds and carports$70k
Construction of a 12m x 4.8m versatile gge.
- Repairs, recladding and strengthening$100k
Internal alterations & reclad
- Fires and heating$5,500
Install masport Kaituna freestanding fire
- New homes$675k
4 bdrm single level dwg
- New homes$900k
3 bdrm single level home
- Decks, pergolas and verandahs$30k
New deck
- Alterations and additions$5,000
Kitchen wall removal
- Relocated buildings$200k
Relocatable home
- Fires and heating$5,500
Install masport Kaituna freestanding fire
- New homes$450k
New dwg
- New homes$310k
New dwg
- New homes$900k
4 bdrm single level dwg. Detached dwgs
- Fires and heating$5,500
Install masport Rangitata insert fire
- Fires and heating$6,500
Install a new inbuilt masport le4000 woodburner fire into an housing - detached dwgs
- New homes$587k
Dwg with attached gge 4 kelly St Rangiora lot 132 dp 604368
- Multiple homes$1.1m
Construction of three attached dwgs with attached garages
- Alterations and additions$23k
Existing highlander unit moved to new site on new foundation. Construction with new sanitary plumbing connections & newstormwater drainage connection linking to existing drainage on site.
- New homes$453k
Dwg with attached gge 2 kelly St Rangiora lot 131 dp 604368
- New homes$350k
Dwg with attached gge 7 kelly St Rangiora lot 125 dp 604368
- Fires and heating$5,500
Masport Rangitata insert fire
- Alterations and additions$1
Amendment 2 - fire rated linings removed & other changes as scheduled.
- Repairs, recladding and strengthening$25k
R3 - remedial work to existing timber baluster to unit 3.
- Garages, sheds and carports$80k
New gge
- Fires and heating$8,000
New install of maxen kinmont 450-p clean air wood fire with pedestal base
ResidentialCommercial The dots are this page of the list.
Near Utuhina
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.