Building consents

Building consents in Timaru

Below: 1,925 consents we hold in Timaru, searchable and on the map.

Consents we hold1,925226 in the last 12 monthsSearch them ↓

Consents on record in Timaru

Individual building consents we hold, each on its property: 1,925 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating519

    91 in the last 12 months · typically $5,000

  2. Alterations and additions294

    58 in the last 12 months · typically $30k

  3. New homes153

    28 in the last 12 months · typically $525k

  4. Garages, sheds and carports127

    21 in the last 12 months · typically $40k

  5. Relocated buildings41

    6 in the last 12 months · typically $120k

  6. Plumbing, drainage and wastewater19

    4 in the last 12 months · typically $10k

  7. Pools and spas15

    3 in the last 12 months · typically $85k

  8. Multiple homes14

    3 in the last 12 months · typically $1.3m

  9. Decks, pergolas and verandahs14

    typically $27k

  10. Retaining walls13

    2 in the last 12 months · typically $25k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

0204060202420252026November 2023: 17December 2023: 11January 2024: 8February 2024: 0March 2024: 19April 2024: 33May 2024: 42June 2024: 21July 2024: 28August 2024: 17September 2024: 16October 2024: 27November 2024: 18December 2024: 18January 2025: 21February 2025: 17March 2025: 31April 2025: 32May 2025: 40June 2025: 36July 2025: 27August 2025: 21September 2025: 37October 2025: 25November 2025: 20December 2025: 22January 2026: 15February 2026: 28March 2026: 31April 2026: 23May 2026: 29June 2026: 33July 2026: 20August 2026: 5September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $3mConstruction of 7 attached dwgs with 6 attached garages in 2 buildings 45 Lindsay Street, Marchwiel
  2. $2.3mConstruction of 8 attached dwgs in 3 buildings 5 Chaucer Street, Highfield
  3. $1.7mDwg additions & alt & install warmington nouveau outdoor open wood fire 416 Pages Road, Gleniti
  4. $1.7mNew dwg with attached gge & install wastewater treatment system 418 Landsborough Road, Otipua Creek
  5. $1.5mNew dwg with attached gge & install escea tc970 mk2 inbuilt woodburner & wwts/erect pole shed 273 Spur Road, Hadlow

1,925 consents

  1. Repairs, recladding and strengthening$50k

    Reclad upper floor of existing two storey dwg

    66 Salisbury Road, Salisbury · 1 Aug 2026 · 26460

  2. Alterations and additions$150k

    Dwg alterations 40 quarry Rd Whiterock lot 2 dp 522661

    40 Quarry Road, Watlington · 1 Aug 2026 · BC260633

  3. Multiple homes$3m

    Construction of 7 attached dwgs with 6 attached garages in 2 buildings

    45 Lindsay Street, Marchwiel · 1 Aug 2026 · BCN/2026/2824

  4. Multiple homes$2.3m

    Construction of 8 attached dwgs in 3 buildings

    5 Chaucer Street, Highfield · 1 Aug 2026 · BCN/2026/4383

  5. Repairs, recladding and strengthening$495k

    Rbw - reclad - partial reclad proposed to existing dwg, with new bevel back timber weatherboards over cavity, new aluminium joinery & new lower roof. Existing brick veneer & joinery within br

    36 Glenwood Avenue, Glenwood · 1 Aug 2026 · BCO10414502

  6. Repairs, recladding and strengthening$150k

    Reroof & reclad dwg, alt internal layout

    6 Quarry Road, Watlington · 1 Jul 2026 · 660/26

  7. Alterations and additions$5,000

    Remove load bearing walls to create open plan kitchen & dining in dwg

    25 Normanby Road, Normanby · 1 Jul 2026 · 802/26

  8. Alterations and additions$750k

    Convert existing church building into a habitable dwg

    103 Beverley Road, Maori Hill · 1 Jul 2026 · ABA/2026/0338

  9. Alterations and additions$1

    Amend add bathrm

    1 Daleast Lane, Levels · 1 Jul 2026 · BC260013.A1

  10. New homes$523k

    New dwg

    , Waimataitai · 1 Jul 2026 · BC2600570

  11. Alterations and additions$45k

    Dwg alt

    77A Wai-Iti Road, Highfield · 1 Jul 2026 · BC260192

  12. Fires and heating$374k

    Dwg add & alterations & install masport Akaroa mkii freestanding woodburner

    42 Spring Road, Gleniti · 1 Jul 2026 · BC260312

  13. Alterations and additions$150k

    Dwg alterations

    26 Orbell Street, Highfield · 1 Jul 2026 · BC260351

  14. Fires and heating$5,000

    Install metro mega rad freestanding woodburner

    85 Spur Road, Hadlow · 1 Jul 2026 · BC260384

  15. Fires and heating$5,000

    Install woodsman Tarras dry mkiii freestanding woodburner

    63 Brasell Road, Pareora West · 1 Jul 2026 · BC260404

  16. Fires and heating$5,000

    Install masport Waimakariri ash freestanding woodburner

    90 Orbell Street, Highfield · 1 Jul 2026 · BC260407

  17. Plumbing, drainage and wastewater$20k

    Install wastewater treatment system

    1 Daleast Lane, Levels · 1 Jul 2026 · BC260409

  18. Alterations and additions$1.7m

    Dwg additions & alt & install warmington nouveau outdoor open wood fire

    416 Pages Road, Gleniti · 1 Jul 2026 · BC260413

  19. Relocated buildings$185k

    Erect relocatable dwg

    418 Landsborough Road, Otipua Creek · 1 Jul 2026 · BC260414

  20. Relocated buildings$185k

    Erect relocatable dwg

    418 Landsborough Road, Otipua Creek · 1 Jul 2026 · BC260420

  21. Alterations and additions$25k

    Dwg alterations

    16 Gimbal Place, Gleniti · 1 Jul 2026 · BC260431

  22. Fires and heating$5,000

    Install maxen kinmont 350h-p wetback freestanding woodburner

    63 Kerrytown Road, Kerrytown · 1 Jul 2026 · BC260435

  23. Fires and heating$5,000

    Install masport Waimakariri ash freestanding woodburner

    15A Hatton Street, West End · 1 Jul 2026 · BC260441

  24. Minor dwellings and sleepouts$900k

    Construction of dwg with attached gge - include a detached minor unit

    29 The Terrace, Timaru · 1 Jul 2026 · BCN/2026/3541

  25. New homes$940k

    Construction of dwg with attached gge

    24 Konini Street, Gleniti · 1 Jul 2026 · BCN/2026/4887

ResidentialCommercial The dots are this page of the list.

Suburbs in Timaru

Where the consents we hold are, most in the last 12 months first.

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Timaru District Council.