Building consents
Building consents in Maori Hill
Below: 47 consents we hold in Maori Hill, searchable and on the map.
Consents on record in Maori Hill
Individual building consents we hold, each on its property: 47 from 1 Oct 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions9
2 in the last 12 months · typically $35k
- Fires and heating9
1 in the last 12 months · typically $5,000
- New homes4
2 in the last 12 months · typically $752k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $900kNew dwg with attached gge & install maxen cargill 350-d freestanding woodburner 3 Mahara Place
- $750kConvert existing church building into a habitable dwg 103 Beverley Road
- $500kNew dwg with attached gge 12 Mahara Place
- $20kDwg alterations & install champion ena plus freestanding pellet burner 1/4 Beverley Road
- $8,000Renovate exisitng building into accessory building 103 Beverley Road
47 consents
- Alterations and additions$750k
Convert existing church building into a habitable dwg
- Fires and heating$20k
Dwg alterations & install champion ena plus freestanding pellet burner
- Alterations and additions$8,000
Renovate exisitng building into accessory building
- New homes$900k
New dwg with attached gge & install maxen cargill 350-d freestanding woodburner
- New homes$500k
New dwg with attached gge
- Alterations and additions$150k
Amend increase extension (+2 bedrooms)
- Fires and heating$5,000
Install ravelli sofia rbv 7010 compact inbuilt pellet burner
- Alterations and additions$450k
Dwg add (wardrobes & ensuites first floor) & alterations (lift)
- Fires and heating$40k
Dwg alterations (install ravelli sofia inbuilt pellet fire - wet floor shower & ridge beam)
- New homes$998k
Rbw - new two-storey dwg, including eight bedrooms, seven & a half bathrooms, kitchen, & dbl gge & private drainage. Timber retaining wall.
- Fires and heating$5,000
Install Jayline PR300DR (ULEB) freestanding woodburner
- Alterations and additions$120k
Amend dwg alterations (wardrobe & ensuite)
- Alterations and additions$15k
Dwg alt (bathrm)
- Fires and heating$5,000
Install masport Hurunui freestanding woodburner
- Alterations and additions$23k
Res/farm - dwg alterations
- New homes$605k
New dwg with attached gge & install ravelli natural 7 freestanding pellet fire
- Alterations and additions$5,000
Dwg alterations (remove wall & install beam)
- Fires and heating$5,000
Install woodsman serene freestanding woodburner
- Fires and heating$350k
Dwg alterations & install metro ultra insert inbuilt woodburner
- Alterations and additions$35k
Dwg add & alterations
- Fires and heating$5,000
Install masport Rangitata beveled inbuilt woodburner
- Fires and heating$5,000
Install pyroclassic iv freestanding woodburner
- New homes$1.3m
New dwg with attached gge (stage 2 - dwg)
- Garages, sheds and carports$30k
Erect gge
- Fires and heating$5,000
Install grant vortex dbv036 freestanding diesel burner
ResidentialCommercial The dots are this page of the list.
Near Maori Hill
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.