Building consents

Residential building consents in Glenwood

Below: 1,323 residential consents we hold in Glenwood, searchable and on the map.

Consents we hold1,32319 in the last 12 monthsSearch them ↓

Residential consents on record in Glenwood

Individual building consents we hold, each on its property: 1,323 from 11 Mar 1993 to 18 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating56

    12 in the last 12 months · typically $5,000

  2. Alterations and additions29

    2 in the last 12 months · typically $25k

  3. Garages, sheds and carports11

    1 in the last 12 months · typically $30k

  4. New homes7

    1 in the last 12 months · typically $500k

  5. Multiple homes3

    1 in the last 12 months · typically $2m

  6. Repairs, recladding and strengthening2

    1 in the last 12 months · typically $258k

  7. Retaining walls2

    1 in the last 12 months · typically $23k

  8. Other new buildings2
  9. Minor dwellings and sleepouts1

    typically $2,000

  10. Pools and spas1

    typically $105k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

0246202420252026November 2023: 1December 2023: 0January 2024: 1February 2024: 4March 2024: 2April 2024: 3May 2024: 1June 2024: 2July 2024: 3August 2024: 2September 2024: 0October 2024: 5November 2024: 3December 2024: 0January 2025: 1February 2025: 5March 2025: 1April 2025: 1May 2025: 4June 2025: 2July 2025: 3August 2025: 2September 2025: 1October 2025: 3November 2025: 4December 2025: 4January 2026: 0February 2026: 1March 2026: 1April 2026: 0May 2026: 3June 2026: 2July 2026: 1August 2026: 3September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $644kErect Two Dwellings Units with Attached Garages 5 Rata Place
  2. $551kNew dwg 34 Pukatea Street
  3. $495kRbw - reclad - partial reclad proposed to existing dwg, with new bevel back timber weatherboards over cavity, new aluminium joinery & new lower roof. Existing brick veneer & joinery within br 36 Glenwood Avenue
  4. $30kErect Garage 116 Morgans Road
  5. $20kInstall drainage & water for subdivision/erect retaining wall 102 Mountain View Road

1,323 consents

  1. Fires and heating$5,000

    Install Masport Hurunui Ash Freestanding Woodburner

    61 Rimu Street · 18 Aug 2026 · BC2026/472

  2. Garages, sheds and carports$30k

    Erect Garage

    116 Morgans Road · 13 Aug 2026 · BC2026/443

  3. Repairs, recladding and strengthening$495k

    Rbw - reclad - partial reclad proposed to existing dwg, with new bevel back timber weatherboards over cavity, new aluminium joinery & new lower roof. Existing brick veneer & joinery within br

    36 Glenwood Avenue · 1 Aug 2026 · BCO10414502

  4. Multiple homes$644k

    Erect Two Dwellings Units with Attached Garages

    5 Rata Place · 16 Jul 2026 · BC2026/358

  5. Alterations and additions

    AMEND Sanitary Fixtures Updated & B2 Modification

    31 Barnes Street · 19 Jun 2026 · BC2015/963A

  6. Fires and heating$7,000

    Install new metro smart insert clean air wood fire with 4.2m eco insert flue kit

    9 Hinau Place · 1 Jun 2026 · 260377

  7. Fires and heating$5,000

    Install Woodsman Coleridge Freestanding Woodburner

    41 Rimu Street · 13 May 2026 · BC2026/239

  8. Fires and heating$5,000

    Install Masport Cashmere Ped Freestanding Woodburner

    266 Wai-Iti Road · 7 May 2026 · BC2026/195

  9. Retaining walls$20k

    Install drainage & water for subdivision/erect retaining wall

    102 Mountain View Road · 1 May 2026 · BC260190

  10. Fires and heating$5,000

    Install Woodsman Serene Freestanding Woodburner

    8 Tawa Street · 27 Mar 2026 · BC2026/132

  11. New homes$551k

    New dwg

    34 Pukatea Street · 1 Feb 2026 · BC26-012584

  12. Fires and heating$5,000

    Install Masport Rangitata Inbuilt Woodburner

    13 Tekapo Street · 12 Dec 2025 · BC2025/721

  13. Alterations and additions

    AMEND B2 Modification

    10 Barnes Street · 8 Dec 2025 · BC2006/54288A

  14. Fires and heating$5,000

    Install Metro Wee Rad Ultra Freestanding Woodburner

    11 Tawa Street · 6 Dec 2025 · BC2025/708

  15. Fires and heating$5,000

    Install Woodsman Coleridge Pedestal Freestanding Woodburner

    10 Hillsden Place · 3 Dec 2025 · BC2025/695

  16. Fires and heating$5,000

    Install Masport Rangitata Inbuilt Woodburner

    37 Pukaki Street · 14 Nov 2025 · BC2025/646

  17. Fires and heating$5,000

    Install Woodsman Serene Freestanding Woodburner

    114 Orbell Street · 14 Nov 2025 · BC2025/669

  18. Fires and heating$5,000

    Install Masport Rangitata Inbuilt Woodburner

    12 Pukaki Street · 3 Nov 2025 · BC2025/648

  19. Fires and heating$5,000

    Install Masport Rangitata Inbuilt Woodburner

    7 Ohau Street · 3 Nov 2025 · BC2025/656

  20. Other new buildings

    AMEND Foundation

    49 Mountain View Road · 16 Oct 2025 · BC2025/208A

  21. Fires and heating$18k

    Alterations (Walls) & Install Champion Tria Plus Pellet

    18 Apsley Street · 11 Oct 2025 · BC2024/726

  22. Retaining walls$25k

    Erect retaining wall to create vehicle access

    1 Hawea Street · 1 Oct 2025 · 1281/25

  23. Pools and spas$105k

    Construction of a swimming pool

    65 Mountain View Road · 1 Sep 2025 · BC250857

  24. Demolition$1.5m

    Building Alterations (Demolition/Seismic Strengthening/ Mechanical &

    70 Morgans Road · 22 Aug 2025 · BC2025/449

  25. Alterations and additions$50k

    Res/farm - alt to kitchen with scullery add. Entry walls, pavement, & fill removed for new piles. Minor modification to building envelope.

    13 Pukatea Street · 1 Aug 2025 · BC25/133937

ResidentialCommercial The dots are this page of the list.

Near Glenwood

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Timaru District Council.