Building consents
Residential building consents in Timaru Port
Below: 139 residential consents we hold in Timaru Port, searchable and on the map.
Residential consents on record in Timaru Port
Individual building consents we hold, each on its property: 139 from 5 May 1993 to 13 Mar 2024. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions4
typically $13k
- Plumbing, drainage and wastewater1
- Other new buildings1
typically $89k
- Repairs, recladding and strengthening1
typically $250k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
139 consents
- Repairs, recladding and strengthening$250k
Building Alteration (Seismic Strengthening)
- Other new buildings$89k
Erect Fogging Pad
- Alterations and additions
AMEND Building Alterations (B2 Modifications)
- Alterations and additions
AMEND Building Addition (Boiler House - Fish Meal Plant) (B2
- Plumbing, drainage and wastewater
AMEND Building Alterations (Concrete Floor) & Drainage (B2
- Alterations and additions$12k
Building Alteration (Smoke Detector System)
- Alterations and additions$13k
Building Alterations (Smoke Detector System)
- Other new buildings$439k
Erect Building (Log Yard Scaler Building)
- Repairs, recladding and strengthening$280k
LAPSED - Building Alterations (ELA Building - EQ Strengthening)
- Repairs, recladding and strengthening$250k
Building Alterations (EQ Strengthening)
- Fires and heating$50k
Building Alterations (Install Pellet Racking System &
- Other new buildings$620k
Erect Six Light Towers
- Alterations and additions$7,000
Install Specified System (Type 4 Alarm)
- Alterations and additions$30k
Building Alterations & Install Specified System (Type 3 Alarm)
- Plumbing, drainage and wastewater$11m
AMEND Erect Fuel Storage Facility (Add Tank Superstructure & Bunding)
- Plumbing, drainage and wastewater$15k
AMEND Erect Storage Tank (Add Elevated Interlinking Walkway)
- Plumbing, drainage and wastewater$99k
Erect Fuel Storage Facility (Stage 3 - Firewater Tank Foundation)
- Other new buildings$190k
Erect Foundation for Silos
- Plumbing, drainage and wastewater$200k
Erect Fuel Storage Facility (Stage 4 - Drainage)
- Plumbing, drainage and wastewater$200k
Erect Storage Tank (Nitric Tank)
- Plumbing, drainage and wastewater$500k
Erect Fuel Storage Facility (Stage 1 & 2 - Tank Foundations)
- Garages, sheds and carports$30k
Erect Carport
- Alterations and additions$10k
Building Alterations (Install WC & Change room)
- Other new buildings$1.8m
Erect Steel Loader Tower & Walkway
- Other new buildings$12k
AMEND Building Addition
ResidentialCommercial The dots are this page of the list.
Near Timaru Port
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.