Building consents
Building consents in Waiuku
Below: 550 consents we hold in Waiuku, searchable and on the map.
Consents on record in Waiuku
Individual building consents we hold, each on its property: 550 from 1 Aug 2019 to 1 Sep 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating109
19 in the last 12 months · typically $5,723
- Alterations and additions79
13 in the last 12 months · typically $49k
- New homes68
8 in the last 12 months · typically $490k
- Garages, sheds and carports27
3 in the last 12 months · typically $60k
- Pools and spas16
2 in the last 12 months · typically $49k
- Plumbing, drainage and wastewater12
4 in the last 12 months · typically $40k
- Relocated buildings12
typically $80k
- Insulation10
2 in the last 12 months · typically $5,000
- Repairs, recladding and strengthening8
1 in the last 12 months · typically $175k
- Commercial alterations7
1 in the last 12 months · typically $95k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $4.3mRbw - construct six new res terraced houses with associated earthworks & drainage. Houses are three storey with three bedrooms, three bathrooms, kitchen, living & gge. Stormwater tank f 55 Kitchener Road, Waiuku
- $2.2mRbw - construction of four detached dwg - two-story dwg, each comprising four-bdrm, two-bathrm, kitchen, living, dining with internal gge & fire rated boundary wall & soffit to lot 4 Fernleigh Avenue, Waiuku
- $780kNew 3 bdrm house with attached dbl gge 18 Ripple Grove, Waiuku
- $580kRbw - construction of single story detached dwg, comprising four bedrooms, one bathrm & one ensuite with a dbl internal gge. Above ground dual-purpose tank, 8 x 13.8m detached shed & ti 29 Kendallvale Drive, Waiuku
- $534k4 bdrm dwg with attached gge 22 Ripple Grove, Waiuku
550 consents
- New homes$470k
Construction of dwg - installation of woodsman kanaku wood box (uleb), freestanding, dry, woodburner, cac - 243695
- Alterations and additions$5,000
Amendment of aba-2026-95 - remove nib wall, install beam
- Alterations and additions$300k
Rbw - amendment to bco10393589 - building consent amendment for alterations to an existing dwg including parapet, gge roof & structural beam changes, channel drain substitution, floor waste
- New homes$280k
Rbw - construction of one-storey detached dwg, bco10416074, comprising three bedrooms, two bathrooms, open-plan kitchen, dining, living room, study, internal gge. Includes stormwater tank, pri
- Fires and heating$7,000
Installation of a solid fuel heater to manufacturers specifications - masport clutha
- Fires and heating$7,000
Installation of a metro fires smart insert solid fuel heater into an existing dbl-open brick fireplace.
- Garages, sheds and carports$200k
Shed with bathrm
- Plumbing, drainage and wastewater$18k
New wastewater system
- Pools and spas$50k
Pool & fencing
- Alterations and additions$30k
Alt to existing dwg - second kitchen
- Fires and heating$6,000
Sfh fixed fee - installation of a solid fuel heater to manufacturers specifications - firenzo encore wood fire replaces existing wood fire.
- Insulation$6,700
Install insulmax blown insulation into exterior walls
- Fires and heating$6,000
Installation of a solid fuel heater to manufacturers specifications - masport Kaituna uleb replaces existing wood fire
- Fires and heating$4,000
Install f/s metro wee rad solid fuel burner (replacement)
- Alterations and additions$150k
Foundations, connections to services (resited dwg). Additional wall bracing.
- Pools and spas$15k
Install new pool fence.
- Fires and heating$3,000
Woodsman uleb freestanding logburner 47 king St Rangiora lot 8 dp 30653
- New homes$320k
Rbw - new single storey four bdrm home with internal access gge, drain bridging (incl recharge pit).
- Alterations and additions$250k
Rbw - internal re-modelling of existing house. Relocating laundry, new bathrm, & reconfiguration of existing bathrm to become ensuite. New insulation to exterior walls.
- Alterations and additions$19k
Rbw - bathrm renovation - tiled shower over stainless steel tray.
- Fires and heating$5,399
Remove existing fire & flue. Install new fire & flue (maxen kinmont 350-l).
- Fires and heating$8,500
Installation of wagener leon - multi fuel freestanding wood fire with wetback.
- Alterations and additions$9,000
Bathrm renovation
- Alterations and additions$80k
New add to existing dwg - existing bdrm enlarged with a new ensuite
- Fires and heating$12k
Heater
ResidentialCommercial The dots are this page of the list.
Suburbs in Waiuku
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.