Building consents
Building consents in Aka Aka
Below: 17 consents we hold in Aka Aka, searchable and on the map.
Consents on record in Aka Aka
Individual building consents we hold, each on its property: 17 from 1 Feb 2021 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions6
1 in the last 12 months · typically $135k
- Plumbing, drainage and wastewater1
typically $10k
- Garages, sheds and carports1
typically $65k
- Fires and heating1
typically $6,330
- Relocated buildings1
typically $250k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $150kFoundations, connections to services (resited dwg). Additional wall bracing. 216 Goodwin Road
17 consents
- Alterations and additions$150k
Foundations, connections to services (resited dwg). Additional wall bracing.
- Alterations and additions$80k
Create sloping ceiling with rafters. Install two new windows. Ensuite 2 refurbished
- Relocated buildings$250k
Connect relocatable dwg to foundations & services
- Plumbing, drainage and wastewater$10k
rbw change existing toilet into bathrm with add of a basin & a shower.
- Fires and heating$6,330
Install yunca xander rural - inbuilt
- Alterations and additions$200k
Transportable dwg with additions & alterations - relating to bld1277/18
- Garages, sheds and carports$65k
Gge
- Alterations and additions$78k
Dwg add & alterations
- Alterations and additions$150k
Living space add to existing house
- Alterations and additions$120k
Dwg add & alterations
- New homes$295k
New 3 bdrm dwg
- New homes$380k
New dwg & attached gge
- Minor dwellings and sleepouts$120k
Granny flat
- Pools and spas$46k
Inground swimming pool
- Pools and spas$4,500
Pool fence
- Fires and heating$4,452
Installation of a solid fuel heater
- Fires and heating$6,101
Heater
ResidentialCommercial The dots are this page of the list.
Near Aka Aka
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.