Building consents
Commercial building consents in Carters Beach
Below: 4 commercial consents we hold in Carters Beach, searchable and on the map.
Commercial consents on record in Carters Beach
Individual building consents we hold, each on its property: 4 from 1 May 2021 to 1 Nov 2023. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations2
typically $48k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
4 consents
- Commercial alterations$35k
Prefabricated dwg constructed in Aflex Homes factory under buller disctrict council with approved bc number bc230093 & to be relocated to site in the district on a separate consent. Thus, this relocation covers only the wastewater council conn
- Commercial alterations$60k
Construction of a 2 bdrm prefabricated dwg at our factory at 32 robertson St to practical completion where it will be transported to site & positioned on driven timber piles. A gge with guest suite with 1 bdrm & bathrm, deckin
- New commercial buildings$630k
Construction of a 2 bdrm prefabricated dwg at our factory at 32 robertson St to practical completion where it will be transported to site & positioned on driven timber piles. A gge with guest suite with 1 bdrm & bathrm, deckin
- New commercial buildings$372k
Construction of a prefabricated three bdrm dwg at our factory at 32 robertson St. Upon practical completion the home will be transported to 10 elley drive where it will be positioned, a 6x9 gge on a thickened edge concrete slab, all services
ResidentialCommercial The dots are this page of the list.
Near Carters Beach
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.