Building consents
Commercial building consents in Westport
Below: 17 commercial consents we hold in Westport, searchable and on the map.
Commercial consents on record in Westport
Individual building consents we hold, each on its property: 17 from 1 Sep 2020 to 1 Oct 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations10
typically $53k
- New commercial buildings1
typically $410k
- Fit-outs1
typically $15k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
17 consents
- Commercial alterations$25k
Installation of non-structural walls & bathrm to outbuilding (gge/workshop).
- Commercial alterations$250k
A prefabricated dwg was constructed in Aflex homes factory & relocated to the site in the district on separate consent
- Commercial alterations$200k
Construction of a gge/studio/workshop with included small apartment with mezzanine floor, kitchen, bathrm & laundry with on-site services.
- Commercial alterations$45k
Construction of a 45m2 workshop
- Commercial alterations$35k
Prefabricated dwg constructed in Aflex Homes factory under buller disctrict council with approved bc number bc230093 & to be relocated to site in the district on a separate consent. Thus, this relocation covers only the wastewater council conn
- Commercial alterations$9,000
Repair damaged piles under kitchen, toilet, bathrm & hall (right side) areas.
- Commercial alterations$80k
Transportable 7.8m x 3.6m studio unit. To be constructed by Russley portables in their Christchurch based factory & transported & fixed to reinforced concrete foundations on site.
- New commercial buildings$410k
Proposed construction of a 4 bdrm timber framed residence at the south peak homes factory, to be transported to site & set on piles, client is to construct a 9 x 6m free standing carport, & a 7.2 x 6m free standing deck at a later stage
- Fit-outs$15k
Non structural bathrm fit out, replacing gib with villa board & tiling. Move plumbing fittings to suit new layout
- Commercial alterations$18k
Building gge / workshop/ storage
- Commercial alterations$60k
Construction of a 2 bdrm prefabricated dwg at our factory at 32 robertson St to practical completion where it will be transported to site & positioned on driven timber piles. A gge with guest suite with 1 bdrm & bathrm, deckin
- Commercial alterations$80k
Positioning of a newly constructed 3 bdrm dwg from our factory at 32 robertson St to 12 pakington St. House will be positioned on driven timber piles where a deck steps & packing area installed.
- New commercial buildings$630k
Construction of a 2 bdrm prefabricated dwg at our factory at 32 robertson St to practical completion where it will be transported to site & positioned on driven timber piles. A gge with guest suite with 1 bdrm & bathrm, deckin
- New commercial buildings$372k
Construction of a prefabricated three bdrm dwg at our factory at 32 robertson St. Upon practical completion the home will be transported to 10 elley drive where it will be positioned, a 6x9 gge on a thickened edge concrete slab, all services
- New commercial buildings$360k
Construction of a 2 bdrm (travers) dwg at our factory at 32 robertson St, Westport which will then be transported to the back of 12 Bentham St where the carport, deck, steps, all services & garden shed with be constructed on site.
- New commercial buildings$250k
3 bdrm domestic dwg constructed at 32 robertson St, Westport (factory) & delivered to 98 derby St, Westport were site services will be connected & the veranda decks & steps will be completed for final inspection.
- Commercial alterations$8,000
To install designed wastewater system, associated drainage & plumbing for the rural workshop
ResidentialCommercial The dots are this page of the list.
Suburbs in Westport
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.