Building consents
Building consents in Coastlands
Below: 124 consents we hold in Coastlands, searchable and on the map.
Consents on record in Coastlands
Individual building consents we hold, each on its property: 124 from 1 Jul 2019 to 1 Sep 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes20
5 in the last 12 months · typically $686k
- Alterations and additions18
4 in the last 12 months · typically $27k
- Garages, sheds and carports9
2 in the last 12 months · typically $50k
- Fires and heating8
1 in the last 12 months · typically $3,000
- Pools and spas6
2 in the last 12 months · typically $55k
- Repairs, recladding and strengthening4
2 in the last 12 months · typically $120k
- Retaining walls3
typically $43k
- Decks, pergolas and verandahs2
typically $18k
- Plumbing, drainage and wastewater1
typically $15k
- Minor dwellings and sleepouts1
typically $10k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.3mNew 2 storey 4 bdrm domestic dwg with attached gge 18 Pacific Parade
- $900kNew house 34 Dawn Parade
- $720kTwo storey res dwg with 4 bedrooms includes woodburner. 6 Acacia Avenue
- $649kConstruct a new res 4 bdrm detached home 62 Pacific Parade
- $575kConstruction of a single level detached dwg consisting of four bedrooms & attached gge 24 Dawn Parade
124 consents
- Alterations and additions$9,200
Alt to dwg - installation of a ravelli elena rv100, freestanding dry, pellet burner cac164071
- Garages, sheds and carports$67k
New gge
- Alterations and additions$5,000
Alt to 3-storey dwg: replace inbuilt fire with a new kompact zero clearance box in masonry fireplace, metrofires standard insert flue & cap flashing over chimney
- Fires and heating$3,000
Installation of a kent Oxford fireplace by flow plumbing whakat?ne
- New homes$900k
New house
- Pools and spas$3,500
Installation of 1200mm high swimming pool fencing & alterations to existing boundary fence. Pool
- Garages, sheds and carports$100k
Add of a non habitable gge
- New homes$720k
Two storey res dwg with 4 bedrooms includes woodburner.
- Pools and spas$60k
Installation of new pool & pool fencing
- Alterations and additions$90k
Alt to dwg - replace selected windows & portion of cladding - internal layout change including bathrm, bdrm, laundry, kitchen upgrades - installation of escea tfs650 mk2 (uleb) freestanding dry woodburner cac260579
- New homes$1.3m
New 2 storey 4 bdrm domestic dwg with attached gge
- New homes$649k
Construct a new res 4 bdrm detached home
- Repairs, recladding and strengthening$49k
Reclad 1st floor of existing 2 storey house
- Alterations and additions$10k
- replace joinery units with new dble glazed units within same openings - remove window/door to allo
- New homes$575k
Construction of a single level detached dwg consisting of four bedrooms & attached gge
- Repairs, recladding and strengthening$150k
Re-clad & re-roof of an existing dwg
- New homes$600k
New 3 bed 2 bath concrete foundation brick & james hardie stria clad dwg.
- Alterations and additions$4,000
Extend 100 diameter connection from existing
- Alterations and additions$550k
Alt to dwg: renovation
- New homes$1.8m
Rbw: lots 1 to 3 - four bedrooms, three bathrooms, two living areas, kitchen, dining, & single gge. Lot 4 - three bedrooms, areas, two bathrooms, living, kitchen, dining, & single gge. Retai
- Fires and heating$2,767
Install a solid fuel fire.
- Fires and heating$500
Instal fireplace in gge
- Fires and heating$4,000
Install wood fire
- New homes$550k
New single storey 3 bdrm dwg with attached dbl gge
- Fires and heating$6,000
Solid fuel heater installation
ResidentialCommercial The dots are this page of the list.
Near Coastlands
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.