Building consents
Building consents in White Pine Bush
Below: 12 consents we hold in White Pine Bush, searchable and on the map.
Consents on record in White Pine Bush
Individual building consents we hold, each on its property: 12 from 1 Dec 2020 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions3
typically $19k
- New homes2
1 in the last 12 months · typically $515k
- Pools and spas2
1 in the last 12 months · typically $18k
- Repairs, recladding and strengthening1
typically $150k
- Fires and heating1
typically $6,000
- Plumbing, drainage and wastewater1
typically $15k
- Garages, sheds and carports1
typically $10k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $850k4 bdrm 2 bathrm house with an attached dbl gge 764B White Pine Bush Road
- $5,000New pool fencing & gate 113G Downard Road
12 consents
- Pools and spas$5,000
New pool fencing & gate
- New homes$850k
4 bdrm 2 bathrm house with an attached dbl gge
- New homes$180k
Proposed building of 2 bdrm dwg
- Garages, sheds and carports$10k
Building a pole shed for storage three bays 15m by 12m
- Plumbing, drainage and wastewater$15k
Proposed onsite waste water system.
- Repairs, recladding and strengthening$150k
Remedial flood damage
- Pools and spas$30k
Swimming pool fencing. Pool not part of consent as under 35,000l.
- Fires and heating$6,000
Install solid fuel heater
- Alterations and additions$250k
Add & alt to existing dwg
- Alterations and additions$19k
Wet area vinyl shower
- Alterations and additions$600
Install wood burning fire in lounge. Work to be done by shapley's plumbing.
- New homes$330k
3 bdrm dwg with attached gge.
ResidentialCommercial The dots are this page of the list.
Near White Pine Bush
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.