Building consents
Building consents in Arkles Bay
Below: 39 consents we hold in Arkles Bay, searchable and on the map.
Consents on record in Arkles Bay
Individual building consents we hold, each on its property: 39 from 1 Sep 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes9
typically $950k
- Fires and heating6
1 in the last 12 months · typically $5,000
- Retaining walls3
typically $58k
- Pools and spas3
typically $6,500
- Alterations and additions3
typically $20k
- Garages, sheds and carports2
typically $4,900
- Relocated buildings1
typically $200k
- Repairs, recladding and strengthening1
typically $200k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $5,000Install woodfire (woodsman serene). 15 Hawaiian Parade
39 consents
- Fires and heating$5,000
Install woodfire (woodsman serene).
- Garages, sheds and carports$4,900
Rbw - make bdrm in existing internal gge with internal wall & new wall & windows to replace gge door
- New homes$1.2m
Rbw - new three level dwg with living area, media room, upper lounge, five-bedrooms, four-bathrooms, two-toilets, attached dbl gge & decks, on fully serviced vacant site. Underground wate
- Retaining walls$58k
Replacement timber pole retaining walls ret1 & ret2 to rear of property.
- Garages, sheds and carports$4,900
Rbw - make bdrm in existing internal gge with internal wall & new wall & windows to replace gge door
- Fires and heating$7,332
installation of a solid fuel heater to manufacturers specifications - Masport Kaituna ULEB wood fire.
- Fires and heating$5,000
Installation of metro wee rad base.
- New homes$163k
DBW RBW proposed minor dwg. Entailing 2 bedrooms,1 bath, 1 wc, 1 kitchen, 1laundry, 1 living dining area. Metalcraft longrun roof & wall cladding proposed.
- Fires and heating$6,300
Installation of solid wood burner (masport Kaituna)
- Repairs, recladding and strengthening$200k
DBC RBW. Reclad existing two storey dwg, including three bedrooms, two bathrooms, kitchen, & dbl gge. Remove all existing cladding & replace
- New homes$985k
Dbc - new four-bdrm dwg, living area, lounge, rumpus, four bathrooms, two toilets & attached dbl gge on a vacant fully serviced site. New driveway, parking areas & retaining walls. New services connected into existing.
- New homes$2.5m
Rbw - new res build 341m2, three storey, four bathrooms, five bedrooms, two car gge & covered parking bay. Gas fire & swimming pool fencing. Block foundation walls with james hardie linea oblique cladding system.
- Relocated buildings$200k
Relocate dwg
- Retaining walls$90k
Rbw - construction of gabion & concrete block retaining walls. Bracing to level 1 internal wall linings + bracing to level 2 waterproof membrane to bathrm lowering ground level to level 2 new spiral staircase new portico roofing (process with coa01
- Alterations and additions$20k
Rbw - existing house. Converting storage area on upper floor to an ensuite. Work includes replacing floor, wall ceiling-linings, includes insulation, wet-area membrane, new ww lines to as-NZ 3500.2.
- Pools and spas$4,950
installation of new pool fencing
- New homes$995k
Rbw - new three storey res dwg, 5 bed, 3.5 bath, kitchen with walk in pantry & internal access dbl gge with integrated laundry. New retaining walls as indicated
- Pools and spas$6,500
construction of swimming pool fencing - application for barrier consent only as the pool has a capacity of less than 35.000 litres (32 ,000) & is exempt under schedule 1 section 23(g).
- Alterations and additions$5,000
installation of wagener sparky ca
- Alterations and additions$300k
Rbw - adding a 50m2 add to the existing dwg, including a new bdrm with ensuite, & expanding the dining room area.
- Fires and heating$4,000
Replacement fireplace masport r3000 woodstacker
- New homes$950k
Rbw - new two-storey dwg (with attic), includes 5-bedrooms, 3-bathrooms, kitchen & 3-car gge. Work includes membrane decks.
- New homes$496k
Rbw - new two level dwg including four bedrooms, two bathrooms, ensuite, media room, open plan kitchen, dining & family room. Internal access single gge.
- New homes$760k
Rbw - proposed two level, four-bdrm main dwg with attached dbl gge & timber deck & attached 2-bdrm minor dwg.
- Pools and spas$10k
pool barrier fence for swimming pool under 35,000l
ResidentialCommercial The dots are this page of the list.
Near Arkles Bay
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.