Building consents

Building consents in Gulf Harbour

Below: 157 consents we hold in Gulf Harbour, searchable and on the map.

Consents we hold15725 in the last 12 monthsSearch them ↓

Consents on record in Gulf Harbour

Individual building consents we hold, each on its property: 157 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. New homes49

    10 in the last 12 months · typically $740k

  2. Alterations and additions14

    4 in the last 12 months · typically $18k

  3. Pools and spas11

    2 in the last 12 months · typically $18k

  4. Fires and heating9

    2 in the last 12 months · typically $4,000

  5. Garages, sheds and carports3

    3 in the last 12 months · typically $20k

  6. Minor dwellings and sleepouts3

    1 in the last 12 months · typically $200k

  7. Commercial alterations3

    typically $19k

  8. Multiple homes1

    1 in the last 12 months · typically $870k

  9. Plumbing, drainage and wastewater1

    1 in the last 12 months · typically $50k

  10. Repairs, recladding and strengthening1

    1 in the last 12 months · typically $53k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

0246202420252026November 2023: 2December 2023: 2January 2024: 1February 2024: 1March 2024: 0April 2024: 1May 2024: 0June 2024: 0July 2024: 0August 2024: 1September 2024: 0October 2024: 0November 2024: 0December 2024: 2January 2025: 1February 2025: 0March 2025: 1April 2025: 5May 2025: 3June 2025: 1July 2025: 2August 2025: 2September 2025: 0October 2025: 1November 2025: 4December 2025: 0January 2026: 1February 2026: 6March 2026: 4April 2026: 3May 2026: 3June 2026: 2July 2026: 1August 2026: 1September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $1.6mRbw - 2x level house. 4 bdrm, study & media room. 2.5 bathrm, internal access dbl gge, separate laundry. Pool & retaining. Integra & jsc vertical shiplap wall cladding. Trapezoidal ro 26 Pacific Cliffs Drive
  2. $1.4mRbw - construction of one two-storey detached dwg, comprising five bedrooms, 4.5 bathrooms, library, lounge, triple gge. Includes stormwater tank, retaining wall & swimming pool. 14 Pacific Cliffs Drive
  3. $997kRbw- proposed one new two storey dwg consisting of five beds, four baths, dbl gge, workshop, kitchen, laundry, living & media. New boundary & onsite retaining wall. New prv. Sw & ww drain 30 Whakairo Crescent
  4. $980kRbw - construction of two storey detached dwgs, each comprising four bedrooms, 3.5 bathrooms, media room, dbl internal gge. Includes pool, wastewater system, retaining walls & fireplace. 4 Te Kauae Rise
  5. $930kRbw - new two storey dwg on bare land with six bedrooms three living rooms, 5 bathrooms, bb weatherboard. 303 Pinecrest Drive

157 consents

  1. New homes$905k

    Rbw - one new two storey dwg consisting of five beds, four baths, dbl gge, workshop, kitchen, laundry, living & media. New boundary & onsite retaining wall. New private sw & ww draina

    28 Whakairo Crescent · 1 Aug 2026 · BCO10410811

  2. Alterations and additions$95k

    Rbw - minor alterations to existing dwg including the add of two first floor decks. Adding a toilet to laundry & other internal & external changes. Create a retained hardstand for vehicl

    8 Clayden Drive · 1 Jul 2026 · BCO10414033

  3. Pools and spas$15k

    Install new pool fencing.

    30 Voyager Drive · 1 Jun 2026 · BCO10412688

  4. Garages, sheds and carports$20k

    Rbw - removal of gge door & infill with framing, new windows & weatherboard cladding. New wc & basin in new timber framed room. Changes to joinery in brick veneer wall. Extend existing ensuit

    25 D'Urville Place · 1 Jun 2026 · BCO10413187

  5. New homes$980k

    Rbw - construction of two storey detached dwgs, each comprising four bedrooms, 3.5 bathrooms, media room, dbl internal gge. Includes pool, wastewater system, retaining walls & fireplace.

    4 Te Kauae Rise · 1 May 2026 · BCO10406118

  6. New homes$997k

    Rbw- proposed one new two storey dwg consisting of five beds, four baths, dbl gge, workshop, kitchen, laundry, living & media. New boundary & onsite retaining wall. New prv. Sw & ww drain

    30 Whakairo Crescent · 1 May 2026 · BCO10410812

  7. Alterations and additions$100k

    Rbw - new glass balustrades: unit p & m - frameless laminated tsg (no top rail) units a, b, d, e, g, h, k, l & o - frameless tsg with top nanorail.

    2 Harbour Village Drive · 1 May 2026 · BCO10411151

  8. New homes$597k

    Rbw - construction of one dbl storey detached dwg, with four bedrooms, 3 bathrooms, kitchen & living area, dbl internal gge.

    28 Whale Bay Rise · 1 Apr 2026 · BCO10406402

  9. Multiple homes$870k

    Rbw - to construct 1 duplex dwgs in total building areas at 292.26m2. Each lot including 3 bedrooms, 2 bathrooms & a single i nternal gge. Both lots (lot 453 & lot 454) are under one same

    107 Voyager Drive · 1 Apr 2026 · BCO10406668

  10. New homes$1.6m

    Rbw - 2x level house. 4 bdrm, study & media room. 2.5 bathrm, internal access dbl gge, separate laundry. Pool & retaining. Integra & jsc vertical shiplap wall cladding. Trapezoidal ro

    26 Pacific Cliffs Drive · 1 Apr 2026 · BCO10410179

  11. New homes$888k

    Rbw - construction of one dbl storey detached dwg, with four bedrooms, 3 bathrooms, kitchen & living area, dbl internal gge.

    20 Whale Bay Rise · 1 Mar 2026 · BCO10406727

  12. New homes$864k

    Rbw - construction of one dbl storey detached dwg, with five bedrooms, 3 bathrooms, kitchen & living area, dbl internal gge. Retaining walls

    24 Whale Bay Rise · 1 Mar 2026 · BCO10408482

  13. Plumbing, drainage and wastewater$50k

    Rbw - screw pile foundation & drainage for a transportable minor dwg of under 40m2. New 1 bed & 1 bath minor dwg consent bco10403984, my site rc luc60460192. New 26.08m2 deck off existin

    3A Astrolabe Place · 1 Mar 2026 · BCO10409150

  14. Fires and heating$5,000

    Install woodfire in same location - replacement (maxen kinmont woodstacker)

    1235 Whangaparaoa Road · 1 Mar 2026 · BCO10410561

  15. New homes$566k

    Rbw - proposed 2 storey dwg with 4 bedrooms, 3 bathrooms & dbl gge. Includes retaining walls.

    26 Whale Bay Rise · 1 Feb 2026 · BCO10406027

  16. Pools and spas$7,011

    Construction of a pool fence for a 5.9x2.3m swim spa with a water depth of 1.3m

    119 Alec Craig Way · 1 Feb 2026 · BCO10406337

  17. Alterations and additions$110k

    Rbw - new basement development - involving temporary propping, excavation, retaining walls & extending the existing gge further back under the existing house

    18 Clansman Terrace · 1 Feb 2026 · BCO10407037

  18. Garages, sheds and carports$20k

    Rbw - proposed gge conversion, converting 2 gge areas into bedrooms.

    4 Careen Grove · 1 Feb 2026 · BCO10407729

  19. Alterations and additions$85k

    Rbw - fill in existing covered decks & move kitchen. Remove existing deck & replace with larger deck. New tea making bench.

    20 Admiralty Rise · 1 Feb 2026 · BCO10408028

  20. Fires and heating$5,000

    Sfh - install woodfire in same location (firenzo stella).

    7 Careen Grove · 1 Feb 2026 · BCO10409180

  21. Garages, sheds and carports$1,500

    Fixed fee - installing a top loader washing machine & tub in the gge. The wastewater pipes are directly adjacent to where the washing machine & tub will be but on the outside of wall. The cost

    36 Bella Vista Drive · 1 Jan 2026 · BCO10406944

  22. Repairs, recladding and strengthening$53k

    Alterations to dwg - partial re-clad.

    46 Nautilus Drive · 1 Nov 2025 · 351633

  23. Minor dwellings and sleepouts$200k

    Rbw - new side add to increase space to create new minor unit with firewall separating main house from unit

    33 Commodore Court · 1 Nov 2025 · BCO10401795

  24. New homes$1.4m

    Rbw - construction of one two-storey detached dwg, comprising five bedrooms, 4.5 bathrooms, library, lounge, triple gge. Includes stormwater tank, retaining wall & swimming pool.

    14 Pacific Cliffs Drive · 1 Nov 2025 · BCO10403404

  25. New homes$930k

    Rbw - new two storey dwg on bare land with six bedrooms three living rooms, 5 bathrooms, bb weatherboard.

    303 Pinecrest Drive · 1 Nov 2025 · BCO10403968

ResidentialCommercial The dots are this page of the list.

Near Gulf Harbour

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Auckland Council.