Building consents

Building consents in Havelock

Below: 196 consents we hold in Havelock, searchable and on the map.

Consents we hold19638 in the last 12 monthsSearch them ↓

Consents on record in Havelock

Individual building consents we hold, each on its property: 196 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating60

    13 in the last 12 months · typically $6,500

  2. Alterations and additions23

    11 in the last 12 months · typically $28k

  3. Garages, sheds and carports14

    2 in the last 12 months · typically $42k

  4. New homes14

    1 in the last 12 months · typically $560k

  5. Relocated buildings11

    2 in the last 12 months · typically $75k

  6. Plumbing, drainage and wastewater10

    2 in the last 12 months · typically $30k

  7. Pools and spas7

    2 in the last 12 months · typically $24k

  8. Decks, pergolas and verandahs4

    typically $45k

  9. Repairs, recladding and strengthening3

    2 in the last 12 months · typically $10k

  10. Minor dwellings and sleepouts3

    1 in the last 12 months · typically $130k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

02468202420252026November 2023: 0December 2023: 1January 2024: 1February 2024: 0March 2024: 2April 2024: 2May 2024: 4June 2024: 1July 2024: 3August 2024: 2September 2024: 3October 2024: 6November 2024: 1December 2024: 0January 2025: 2February 2025: 2March 2025: 1April 2025: 7May 2025: 2June 2025: 8July 2025: 7August 2025: 3September 2025: 2October 2025: 7November 2025: 2December 2025: 4January 2026: 2February 2026: 1March 2026: 7April 2026: 3May 2026: 7June 2026: 8July 2026: 3August 2026: 1September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $2mR3 - 6x new 2 storey terraced townhouses. 3 Havelock Quay, Havelock
  2. $490kDwg & solid fuel heater 2708 Kaiuma Bay Road, Kaiuma Bay
  3. $160kTwo pole sheds 2676 State Highway 6, Okaramio
  4. $150kDwg alterations 2574 State Highway 6, Okaramio
  5. $120kDwg alterations 7 Cook Street, Havelock

196 consents

  1. Alterations and additions$25k

    R2 - alt to existing two-storey dwg including removal of wall & new beam.

    10 Lawrence Street, Havelock · 1 Aug 2026 · 573116

  2. Fires and heating$7,000

    Install freestanding wood burner

    14 Inglis Street, Havelock · 1 Jul 2026 · 26/0510

  3. Multiple homes$2m

    R3 - 6x new 2 storey terraced townhouses.

    3 Havelock Quay, Havelock · 1 Jul 2026 · 570492

  4. Fires and heating$6,782

    Install new masport clutha woodburner with ash pan & fix to floor. Install new flue kit through roof & flash flue with new dektite onto existing soaker flashing. Fit flue shield

    33 Main Road, Havelock · 1 Jul 2026 · BC260209

  5. Alterations and additions$120k

    Dwg alterations

    7 Cook Street, Havelock · 1 Jun 2026 · 26/0122

  6. Relocated buildings$35k

    Relocate sleepout to site

    143 Mt Riley Road, Okaramio · 1 Jun 2026 · BC260317

  7. Relocated buildings$5,000

    Relocate gge to site

    15A Mahakipawa Road, Havelock · 1 Jun 2026 · BC260401

  8. Fires and heating$5,000

    Free-standing metro micro rad solid fuel heater

    55 Orapito Road, Kaiuma Bay · 1 Jun 2026 · BC260418

  9. Alterations and additions$150k

    Dwg alterations

    2574 State Highway 6, Okaramio · 1 Jun 2026 · BC260442

  10. Repairs, recladding and strengthening$97k

    Recladding & new windows for dwg

    50 Moenui Road, Havelock · 1 Jun 2026 · BC260446

  11. Fires and heating$8,000

    Free-standing metro Ltd xtreme rad solid fuel heater

    12 Prices Road, Havelock · 1 Jun 2026 · BC260490

  12. Fires and heating$9,500

    Free-standing escea tsf1000 solid fuel heater

    50 Tepuia Heights, Havelock · 1 Jun 2026 · BC260504

  13. Alterations and additions$10k

    Siting of a brand new transportable dwg

    2447 State Highway 6, Okaramio · 1 May 2026 · 260129

  14. Fires and heating$5,000

    Install masport Kaituna freestanding fire

    3416 State Highway 6, Havelock · 1 May 2026 · BC26-012881

  15. Fires and heating$5,000

    Install masport Kaituna freestanding fire

    3416 State Highway 6, Havelock · 1 May 2026 · BC26-012882

  16. Alterations and additions$1

    Amendment to bc260009: change of siting

    2708 Kaiuma Bay Road, Kaiuma Bay · 1 May 2026 · BC260302

  17. Plumbing, drainage and wastewater$40k

    Amendment to bc100911: wastewater field upgrade

    4265 State Highway 6, Havelock · 1 May 2026 · BC260309

  18. Alterations and additions$20k

    Extend dwg to create mud room

    9 Twidles Road, Havelock · 1 May 2026 · BC260340

  19. Fires and heating$6,500

    Installation of a metro wee rad leg

    31 Main Road, Havelock · 1 May 2026 · EBC-2026-928/0

  20. Alterations and additions$1

    Amend - remove add/alterations

    27 Main Road, Havelock · 1 Apr 2026 · 2.2022.593.1.A1

  21. Fires and heating$6,000

    Free-standing maxen kinmont 350 solid fuel heater

    8 Healys Road, Canvastown · 1 Apr 2026 · BC260255

  22. Fires and heating$8,000

    Free-standing woodsman Tarras mkiii solid fuel heater

    5A Takorika Street, Havelock · 1 Apr 2026 · BC260278

  23. Retaining walls$30k

    Remediation of failed boundary retaining wall with timber pole cantilever retaining wall

    4 Kavanagh Place, Havelock · 1 Mar 2026 · BC250631

  24. New homes$490k

    Dwg & solid fuel heater

    2708 Kaiuma Bay Road, Kaiuma Bay · 1 Mar 2026 · BC260009

  25. Alterations and additions$1

    Amendment to bc250757: multiple changes to dwg alterations & additions

    8 Mahakipawa Road, Havelock · 1 Mar 2026 · BC260049

ResidentialCommercial The dots are this page of the list.

Suburbs in Havelock

Where the consents we hold are, most in the last 12 months first.

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.