Building consents
Building consents in Okaramio
Below: 16 consents we hold in Okaramio, searchable and on the map.
Consents on record in Okaramio
Individual building consents we hold, each on its property: 16 from 1 Feb 2020 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating5
typically $8,000
- Alterations and additions4
3 in the last 12 months · typically $155k
- Garages, sheds and carports3
1 in the last 12 months · typically $78k
- Plumbing, drainage and wastewater2
typically $20k
- Relocated buildings1
1 in the last 12 months · typically $35k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $160kTwo pole sheds 2676 State Highway 6
- $150kDwg alterations 2574 State Highway 6
- $58kGge 36 Camerons Road
- $35kRelocate sleepout to site 143 Mt Riley Road
- $10kSiting of a brand new transportable dwg 2447 State Highway 6
16 consents
- Relocated buildings$35k
Relocate sleepout to site
- Alterations and additions$150k
Dwg alterations
- Alterations and additions$10k
Siting of a brand new transportable dwg
- Alterations and additions$160k
Two pole sheds
- Garages, sheds and carports$58k
Gge
- Alterations and additions$160k
Res alterations & additions
- Fires and heating$8,000
Free standing metro mega rad solid fuel heater
- Plumbing, drainage and wastewater$40k
On-site wastewater system
- Fires and heating$8,000
Free standing maxen kinmont 450 solid fuel heater with wetback
- Garages, sheds and carports$78k
Garages & or shed
- Fires and heating$5,000
Free-standing jayline fr400 rural solid fuel heater with wetback
- Plumbing, drainage and wastewater$500
Plumbing & drainage: add of toilet
- Fires and heating$8,000
Firenzo Bronte rural solid fuel heater
- Garages, sheds and carports$100k
Gge with two lean-to sheds
- Fires and heating$3,000
Free-standing jayline fr400 solid fuel heater
- Fires and heating$4,500
Free-standing metro xtreme rad leg log fire
ResidentialCommercial The dots are this page of the list.
Near Okaramio
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.