Building consents
Building consents in Kaiuma Bay
Below: 24 consents we hold in Kaiuma Bay, searchable and on the map.
Consents on record in Kaiuma Bay
Individual building consents we hold, each on its property: 24 from 1 Nov 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating6
2 in the last 12 months · typically $6,750
- New homes4
1 in the last 12 months · typically $555k
- Alterations and additions2
2 in the last 12 months · typically $14k
- Garages, sheds and carports2
typically $38k
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $14k
- Pools and spas1
typically $10k
- Relocated buildings1
typically $76k
- Retaining walls1
typically $25k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $490kDwg & solid fuel heater 2708 Kaiuma Bay Road
- $28kRes alterations & additions 2700 Kaiuma Bay Road
- $14kSewer drainage interceptor tank 2708 Kaiuma Bay Road
- $8,000Free-standing metro wee rad woody solid fuel heater with wetback 1768 Kaiuma Bay Road
- $5,000Free-standing metro micro rad solid fuel heater 55 Orapito Road
24 consents
- Fires and heating$5,000
Free-standing metro micro rad solid fuel heater
- Alterations and additions$1
Amendment to bc260009: change of siting
- New homes$490k
Dwg & solid fuel heater
- Fires and heating$8,000
Free-standing metro wee rad woody solid fuel heater with wetback
- Plumbing, drainage and wastewater$14k
Sewer drainage interceptor tank
- Alterations and additions$28k
Res alterations & additions
- Retaining walls$25k
Retaining wall
- Fires and heating$8,000
Free-standing metro wee rad leg solid fuel heater
- Fires and heating$6,500
Free-standing metro tiny rad woody solid fuel heater
- Fires and heating$7,000
Free-standing metro wee rad legs solid fuel heater
- New homes$1.2m
Dwg & solid fuel heater, gge, pole shed & wastewater system
- New homes$150k
Dwg & solid fuel heater
- Fires and heating$4,000
Free-standing Jayline FR400 clean air solid fuel heater
- Garages, sheds and carports$47k
Pole shed
- New homes$620k
Dwg & solid fuel heater
- Relocated buildings$76k
Relocate new dwg & drainage work
- Garages, sheds and carports$29k
Garages & or shed
- Pools and spas$10k
Swimming pool (under 35,000 litres) & fencing
- New homes$320k
Dwg
- New homes$525k
Dwg with free-standing rosa r70 pellet fire
- Fires and heating$4,000
Free-standing masport Akaroa solid fuel heater
- Insulation$1
Amendment to bc191182 - multiple changes: insulation, hw system, cladding, log fire deletion. Sw drainage
- New homes$336k
Dwg
- New homes$448k
Dwg with log fire
ResidentialCommercial The dots are this page of the list.
Near Kaiuma Bay
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.