Consents on record in Camborne
Individual building consents we hold, each on its property: 86 from 1 Oct 2019 to 1 Sep 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions25
5 in the last 12 months · typically $12k
- Fires and heating12
3 in the last 12 months · typically $5,812
- New homes5
4 in the last 12 months · typically $456k
- Retaining walls3
1 in the last 12 months · typically $21k
- Garages, sheds and carports3
typically $59k
- Repairs, recladding and strengthening3
typically $50k
- Minor dwellings and sleepouts3
typically $40k
- Plumbing, drainage and wastewater2
1 in the last 12 months · typically $16k
- Decks, pergolas and verandahs2
typically $63k
- Pools and spas1
typically $155k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $650kNew two storey dwg, 2 bedrooms & 2 bathrooms 53 Truro Road
- $456kConstruction of a dwg with attached gge. 4 Padstow Place
- $400kConstruction of dwg with attached gge. 6 Padstow Place
- $395kConstruction of dwg with attached gge - lot 18 7 Padstow Place
- $75kExtension to entry area of existing lower floor 2 St Austell Close
86 consents
- New homes$395k
Construction of dwg with attached gge - lot 18
- Fires and heating$9,999
Install freestanding firenzo contessa (leg) uleb solid fuel heater
- Alterations and additions$15k
Heating unit - installation of a new monte euro freestanding woodburner
- Alterations and additions$10k
Additions/alterations - new bathrm within existing room
- Alterations and additions$35k
Additions/alterations - new wet floor shower in ensuite
- Fires and heating$9,500
Replacement fire. Installation of a new woodsman serene freestanding solid fuel heater
- New homes$400k
Construction of dwg with attached gge.
- New homes$456k
Construction of a dwg with attached gge.
- Fires and heating$3,000
Installation of new replacement wood burner & flue system (metro smart insert)
- Retaining walls$30k
Retaining wall replacement
- Alterations and additions$75k
Extension to entry area of existing lower floor
- New homes$650k
New two storey dwg, 2 bedrooms & 2 bathrooms
- Plumbing, drainage and wastewater$18k
Plumbing/drainage works - installation of new toilet
- Alterations and additions$10k
Heating unit - installation of a new pyro classic freestanding woodburner
- Alterations and additions$11k
Amendment 1 - sanitary & window alterations - amended layout
- Plumbing, drainage and wastewater$15k
The add of a new toilet & wash hand basin
- Garages, sheds and carports$25k
Converting existing gge into an additional bdrm & add of new ensuite to existing bdrm
- Alterations and additions$10k
Additions/alterations - installation of modular clearlite shower enclosure
- Repairs, recladding and strengthening$400k
Additions/alterations - re-clad of existing dwg. Replacement of wall insulation, windows & external doors. New roofing membrane installed over existing.
- Fires and heating$8,500
Heating unit - installation of a new masport Akaroa freestanding wood burner
- Fires and heating$7,300
Install masport Akaroa freestanding fire heating
- Minor dwellings and sleepouts$6,800
To replace exisiting fire with new warmington studio free standing woodburner
- Fires and heating$5,123
Install new fire & flue (maxen kinmont 350-p).
- Alterations and additions$9,000
Bathrm & window alterations
- Fires and heating$4,500
Install replacement monte euro free standing woodburner
ResidentialCommercial The dots are this page of the list.
Near Camborne
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.