Building consents
Building consents in Waitangirua
Below: 61 consents we hold in Waitangirua, searchable and on the map.
Consents on record in Waitangirua
Individual building consents we hold, each on its property: 61 from 1 Sep 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions15
3 in the last 12 months · typically $40k
- Relocated buildings4
3 in the last 12 months · typically $85k
- New homes4
typically $240k
- Plumbing, drainage and wastewater3
1 in the last 12 months · typically $12k
- Garages, sheds and carports3
typically $45k
- Fires and heating3
typically $6,200
- Multiple homes2
1 in the last 12 months · typically $2.4m
- Retaining walls2
typically $31k
- Insulation1
typically $5,000
- Decks, pergolas and verandahs1
typically $25k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $3.6mConsentium info only - 1x new multi unit dwg x 2 units - ranging from 2-3 bedrooms. 343 Warspite Avenue
- $130kFoundations, plumbing & drainage for relocated dwg 132 Warspite Avenue
- $110kAdditions/alterations - internal alterations & construction of a new deck 15 Pukaki Grove
- $60kAdditions/alterations - new kitchen, bathrm, laundry, close in back porch & 4 new joinery units 50 Arahura Crescent
- $40kRelocated sleep out 8 Arahura Crescent
61 consents
- Alterations and additions$110k
Additions/alterations - internal alterations & construction of a new deck
- Relocated buildings$40k
Relocated sleep out
- Alterations and additions$35k
Additions/alterations - new level entry shower, & other internal bathrm modifications
- Relocated buildings$130k
Foundations, plumbing & drainage for relocated dwg
- Relocated buildings$3,500
Stormwater lateral is to be relocated clear of the dwg
- Plumbing, drainage and wastewater$800
Additions/alterations - adding a new toilet to existing bathrm
- Alterations and additions$60k
Additions/alterations - new kitchen, bathrm, laundry, close in back porch & 4 new joinery units
- Multiple homes$3.6m
Consentium info only - 1x new multi unit dwg x 2 units - ranging from 2-3 bedrooms.
- Alterations and additions$1
Additions/alterations - extension to existing dwg
- Alterations and additions$30k
New level entry shower, bathrm door widening & moving
- Alterations and additions$50k
New level entry shower, plus other internal modifications
- Fires and heating$6,200
Install freestanding maxen kinmont 350 p solid fuel heater
- Alterations and additions$1
Amendment 1 - changing of timber wall, floor & roof framing to sed steel, change cladding from hermpac to abodo vulcan vertical shiplap
- Relocated buildings$150k
Relocate new dwg to site & connect to services housing - detached
- Alterations and additions$46k
New accessible bathrm & remove non-load bearing wall
- Alterations and additions$100k
17m2 extension to master bdrm with a new walk in robe & ensuite
- Garages, sheds and carports$60k
Construct a Versatile gge 6m x 6.6m non-habitable
- Plumbing, drainage and wastewater$34k
Installation of a new wastewater system ancillary
- Retaining walls$31k
Main - construction of timber retaining walls. To be read in conjunction with bca230619934
- Retaining walls$31k
Admin- construction of timber retaining walls. To be read in conjunction with bca230593066
- New homes$240k
New single level dwg - 2 bedrooms & 1 bathrm
- Alterations and additions$10k
Bathrm alt for an accessible shower
- Garages, sheds and carports$1
Amendment 1 - gge location revised
- Alterations and additions$40k
Alterations to existing sunroom
- Fires and heating$9,400
To install a yunca wegj free standing wood fire
ResidentialCommercial The dots are this page of the list.
Near Waitangirua
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.