Building consents

Building consents in Rānui

Below: 85 consents we hold in Rānui, searchable and on the map.

Consents we hold859 in the last 12 monthsSearch them ↓

Consents on record in Rānui

Individual building consents we hold, each on its property: 85 from 1 Aug 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Alterations and additions13

    3 in the last 12 months · typically $30k

  2. New homes8

    2 in the last 12 months · typically $488k

  3. Garages, sheds and carports6

    1 in the last 12 months · typically $57k

  4. Fires and heating5

    1 in the last 12 months · typically $4,950

  5. Insulation3

    typically $5,000

  6. Minor dwellings and sleepouts3

    typically $15k

  7. Decks, pergolas and verandahs2

    1 in the last 12 months · typically $100k

  8. Repairs, recladding and strengthening2

    typically $23k

  9. Relocated buildings1

    1 in the last 12 months · typically $50k

  10. Commercial alterations1

    typically $50k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01234202420252026November 2023: 2December 2023: 3January 2024: 2February 2024: 0March 2024: 1April 2024: 0May 2024: 1June 2024: 0July 2024: 0August 2024: 0September 2024: 1October 2024: 1November 2024: 0December 2024: 1January 2025: 0February 2025: 0March 2025: 0April 2025: 0May 2025: 0June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 1December 2025: 2January 2026: 0February 2026: 0March 2026: 1April 2026: 1May 2026: 0June 2026: 4July 2026: 0August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $580kRbw - construction of a one-storey dwg, including four bedrooms, two bathrooms, dbl internal gge, on-site stormwater tank. 59 Huanui Street
  2. $403kRbw - new one-storey dwg, including three bedrooms, three bathrooms, kitchen, single gge & private drainage, timber retaining & keystone walls. Proposed address: 39 tamaota terrace, upper 75 Huanui Street
  3. $184kAmendment 1 - build the original deck on new deck piles & bearers (revised pile layout from original), & adding a new back of house deck & stairs access; install new carport walls & footings, fix all new ecoply as bracing 68 Ernest Street
  4. $110kAdditions/alterations - external & internal additions/alterations & a new gge 39A Huanui Street
  5. $50kRelocations - foundations & plumbing drainage for 2x relocatable dwgs 2B Marua Place

85 consents

  1. Fires and heating$3,500

    Reposition existing 2nd hand masport r5000 freestanding fire

    22 Martin Street · 1 Jun 2026 · BC26-012964

  2. Garages, sheds and carports$1,000

    Amendment 1 - gge slab change to rib raft with 220mm polystyrene & reinforced gaps between 1100 x 1100mm pods

    39A Huanui Street · 1 Jun 2026 · BCA260109655-1

  3. New homes$580k

    Rbw - construction of a one-storey dwg, including four bedrooms, two bathrooms, dbl internal gge, on-site stormwater tank.

    59 Huanui Street · 1 Jun 2026 · BCO10409662

  4. New homes$403k

    Rbw - new one-storey dwg, including three bedrooms, three bathrooms, kitchen, single gge & private drainage, timber retaining & keystone walls. Proposed address: 39 tamaota terrace, upper

    75 Huanui Street · 1 Jun 2026 · BCO10409678

  5. Alterations and additions$6,000

    Heating unit - to supply & install a maxen Forbury 550 inbuilt fire into a masonry cavity

    7 King Crescent · 1 Apr 2026 · BCA260225560

  6. Alterations and additions$110k

    Additions/alterations - external & internal additions/alterations & a new gge

    39A Huanui Street · 1 Mar 2026 · BCA260109655

  7. Decks, pergolas and verandahs$184k

    Amendment 1 - build the original deck on new deck piles & bearers (revised pile layout from original), & adding a new back of house deck & stairs access; install new carport walls & footings, fix all new ecoply as bracing

    68 Ernest Street · 1 Dec 2025 · BCA0144/17-1

  8. Relocated buildings$50k

    Relocations - foundations & plumbing drainage for 2x relocatable dwgs

    2B Marua Place · 1 Dec 2025 · BCA251031378

  9. Alterations and additions$7,500

    Heating unit - installation of a new maxen kinmont 350 ped freestanding wood burner to replace existing

    43 Awatea Street · 1 Nov 2025 · BCA251044322

  10. Retaining walls$5,000

    Amendment 1 - dwg moved south west, add of retaining wall

    65A Huanui Street · 1 Dec 2024 · BCA231229116-1

  11. Commercial alterations$50k

    Studio - new art workshop with shower & kitchenette

    12 Kivell Street · 1 Oct 2024 · BCA240767584

  12. Garages, sheds and carports$10k

    COA - unconsented bathrm installed in existing gge.

    144 Mungavin Avenue · 1 Sep 2024 · COA231044755

  13. New homes$500k

    New single storey dwg - 3 bedrooms & 2 bathrooms & a separate workshop

    65A Huanui Street · 1 May 2024 · BCA231229116

  14. Repairs, recladding and strengthening$25k

    Amendment 1 - remedial work for unconsented extension

    144 Mungavin Avenue · 1 Mar 2024 · BCA230775354-1

  15. Alterations and additions$20k

    Amendment 1 - the eastern laundry / kitchen area is to be enlarged to the east & south.

    47 Awatea Street · 1 Jan 2024 · BCA201203075-1

  16. New homes$495k

    New single storey dwg, 3 bedrooms & 1 bathrm

    15A Martin Street · 1 Jan 2024 · BCA231112407

  17. Minor dwellings and sleepouts$200k

    New sleepout & art studio with bathrm & laundry

    37 Huanui Street · 1 Dec 2023 · BC2301258

  18. New homes$700k

    New two storey dwg, 3 bedrooms & 2 bathrooms

    10 Ash Grove · 1 Dec 2023 · BCA230759134

  19. Repairs, recladding and strengthening$20k

    Remedial work for unconsented extension

    144 Mungavin Avenue · 1 Dec 2023 · BCA230775354

  20. Garages, sheds and carports$50k

    Construction of a new shed.

    8A Arawhata Street · 1 Nov 2023 · BCA231037293

  21. Alterations and additions$15k

    Bathrm alt - new level entry accessible wet area shower

    22 Gear Terrace · 1 Nov 2023 · BCA231053231

  22. Alterations and additions$1,000

    Amendment 1 - change to cladding

    2 Chew Place · 1 Oct 2023 · BCA230863085-1

  23. Garages, sheds and carports$63k

    Construct versatile gge

    2 Chew Place · 1 Sep 2023 · BCA230863085

  24. Alterations and additions$20k

    Building add (verandahs)

    28 Martin Street · 1 Aug 2023 · 000003172023

  25. Alterations and additions$30k

    Amendment 1 - alternative design is required

    38 McKillop Street · 1 Jul 2023 · BCA221224218-1

ResidentialCommercial The dots are this page of the list.

Near Rānui

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Porirua City Council.