Building consents

Building consents in Hope

Below: 122 consents we hold in Hope, searchable and on the map.

Consents we hold12216 in the last 12 monthsSearch them ↓

Consents on record in Hope

Individual building consents we hold, each on its property: 122 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. New homes35

    7 in the last 12 months · typically $612k

  2. Alterations and additions19

    2 in the last 12 months · typically $70k

  3. Fires and heating12

    3 in the last 12 months · typically $5,950

  4. Garages, sheds and carports7

    1 in the last 12 months · typically $40k

  5. Pools and spas7

    typically $65k

  6. Relocated buildings3

    2 in the last 12 months · typically $93k

  7. Decks, pergolas and verandahs3

    typically $35k

  8. Minor dwellings and sleepouts2

    typically $93k

  9. Plumbing, drainage and wastewater1

    1 in the last 12 months · typically $21k

  10. Repairs, recladding and strengthening1

    typically $150k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

0246202420252026November 2023: 1December 2023: 2January 2024: 3February 2024: 2March 2024: 0April 2024: 0May 2024: 0June 2024: 1July 2024: 0August 2024: 1September 2024: 0October 2024: 0November 2024: 0December 2024: 0January 2025: 0February 2025: 1March 2025: 2April 2025: 4May 2025: 5June 2025: 2July 2025: 4August 2025: 4September 2025: 3October 2025: 4November 2025: 1December 2025: 0January 2026: 0February 2026: 2March 2026: 2April 2026: 1May 2026: 5June 2026: 2July 2026: 2August 2026: 1September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $812kConstruct dwg with internal access gge 19 Greenway Crescent
  2. $750kConstruct dwg with internal gge & freestanding 65 Bartlett Road
  3. $700kConstruct dwg with internal gge 44 Hallmark Drive
  4. $700kConstruct dwg with internal access gge 17 Greenway Crescent
  5. $578kConstruct dwg with internal gge 15 Greenway Crescent

122 consents

  1. Alterations and additions$20k

    Ensuite renovation

    295 Main Road Hope · 1 Aug 2026 · ABA/2026/0420

  2. Fires and heating$7,000

    Install freestanding wood burner

    161 Paton Road · 1 Jul 2026 · 26/0588

  3. Relocated buildings$1

    Relocated AES septic tank, field & two soak pits

    293 Paton Road · 1 Jul 2026 · CA260222

  4. Plumbing, drainage and wastewater$21k

    Replace existing septic system with new protec 10 wastewater detached dwgs

    234 Main Road Hope · 1 Jun 2026 · 26/0385

  5. New homes$550k

    Construct dwg with internal access gge

    13 Greenway Crescent · 1 Jun 2026 · 26/0444

  6. New homes$700k

    Construct dwg with internal access gge

    17 Greenway Crescent · 1 May 2026 · 26/0277

  7. New homes$812k

    Construct dwg with internal access gge

    19 Greenway Crescent · 1 May 2026 · 26/0326

  8. New homes$578k

    Construct dwg with internal gge

    15 Greenway Crescent · 1 May 2026 · 26/0419

  9. Fires and heating$7,000

    Install freestanding wood burner

    51 Haycock Road · 1 May 2026 · 26/0451

  10. Alterations and additions$150k

    Alt of dwg - first floor add of walk-in robe & ensuite, changes to living area, recladding of roof & partial wall & relocation of woodsman serene, freestanding, dry, woodburner, cac 194586.

    232 Main Road Hope · 1 May 2026 · BCN/2026/3083

  11. Garages, sheds and carports$70k

    Construct detached shed with toilet

    3 Edens Road · 1 Apr 2026 · 26/0133

  12. New homes$750k

    Construct dwg with internal gge & freestanding

    65 Bartlett Road · 1 Mar 2026 · 26/0016

  13. New homes$700k

    Construct dwg with internal gge

    44 Hallmark Drive · 1 Mar 2026 · 26/0020

  14. New homes$450k

    Construct dwg with internal access gge

    26 Greenway Crescent · 1 Feb 2026 · 26/0006

  15. Fires and heating$6,000

    Install freestanding wood burner

    198 Main Road Hope · 1 Feb 2026 · 26/0093

  16. Relocated buildings$93k

    Relocate existing wastewater fields & install inground pool

    107 Haycock Road · 1 Nov 2025 · 25/0817

  17. Minor dwellings and sleepouts$140k

    Construct detached dbl gge & studio

    513 Hill Street South · 1 Oct 2025 · 25/0751

  18. New homes$632k

    Construct new dwg with internal access gge

    22 Greenway Crescent · 1 Oct 2025 · 25/0811

  19. Decks, pergolas and verandahs$35k

    Add of new balcony decks

    192 Main Road Hope · 1 Oct 2025 · ABA/2025/0490

  20. New homes$470k

    3 bdrm domestic dwg with attached gge

    19 Ara o Kahuroa · 1 Oct 2025 · BCI2500045

  21. New homes$438k

    Construct dwg with internal access dbl gge

    7 Ara o Kahuroa · 1 Sep 2025 · 25/0675

  22. New homes$700k

    Construct dwg & shed

    77 Bartlett Road · 1 Sep 2025 · 25/0676

  23. Fires and heating$6,000

    Install freestanding woodburner

    203 Main Road Hope · 1 Sep 2025 · 25/0707

  24. New homes$700k

    Construct dwg with internal access gge

    14 Hallmark Drive · 1 Aug 2025 · 25/0606

  25. Minor dwellings and sleepouts$45k

    Extend gge to add a sleepout

    218 Ranzau Road · 1 Aug 2025 · 25/0612

ResidentialCommercial The dots are this page of the list.

Near Hope

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Tasman District Council.