Building consents
Building consents in Concord
Below: 130 consents we hold in Concord, searchable and on the map.
Consents on record in Concord
Individual building consents we hold, each on its property: 130 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating35
5 in the last 12 months · typically $6,000
- New homes18
5 in the last 12 months · typically $481k
- Alterations and additions12
4 in the last 12 months · typically $20k
- Garages, sheds and carports11
3 in the last 12 months · typically $40k
- Decks, pergolas and verandahs4
1 in the last 12 months · typically $28k
- Plumbing, drainage and wastewater4
typically $5,500
- Retaining walls1
1 in the last 12 months · typically $1,000
- Minor dwellings and sleepouts1
1 in the last 12 months · typically $50k
- Multiple homes1
1 in the last 12 months · typically $650k
- Relocated buildings1
typically $40k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $800kNew dwg with attached gge, workshop & construct timber retaining wall 4 Fitzpatrick Crescent
- $650kErect two attached dwgs, each with attached gge (two units in total) 6 Rose Drive
- $465kSingle storey 3 bdrm dwg with attached gge 27 Blackhead Road
- $450k3 bdrm domestic dwg with attached gge 31 Blackhead Road
- $450kNew dwg with attached gge, install solid fuel burner, construct retaining walls 35 Mulford Street
130 consents
- Alterations and additions$100k
Remove wall to create open plan kitchen & lounge, alt layout of bathrm, toilet & laundry, install insulation in dwg
- Fires and heating$8,820
Install solid fuel burner in dwg
- Minor dwellings and sleepouts$50k
Erect sleepout
- Alterations and additions$2,500
Amendment to aba-2026-136 - revise part cladding, door, bracing & retaining walls, install window
- Fires and heating$3,000
Install solid fuel burner in dwg
- Decks, pergolas and verandahs$100k
Alt dwg & extend deck
- Fires and heating$6,700
Installation of a solid fuel heater to manufacturers specifications metro wee rad woody
- New homes$800k
New dwg with attached gge, workshop & construct timber retaining wall
- Garages, sheds and carports$1
3 bdrm domestic dwg with attached gge amendment 1: amendment - erect timber retaining wall & remove timber driven piles from slab
- Garages, sheds and carports$1
3 bdrm domestic dwg with attached gge amendment 1: amendment 1 - erect timber retaining wall & remove timber driven piles from slab
- Garages, sheds and carports$1
Single storey 3 bdrm dwg with attached gge amendment 1: amendment - erect timber retaining wall & remove driven timber piles from slab
- New homes$450k
New dwg with attached gge, install solid fuel burner, construct retaining walls
- New homes$450k
3 bdrm domestic dwg with attached gge
- New homes$465k
Single storey 3 bdrm dwg with attached gge
- New homes$450k
3 bdrm domestic dwg with attached gge
- Alterations and additions$8,000
Install cavity slider in lounge, alt bracing of dwg
- Retaining walls$1,000
Amendment to aba-2024-522 - revise retaining wall
- Fires and heating$5,000
Install yunca ruby uleb heater in dwg
- Multiple homes$650k
Erect two attached dwgs, each with attached gge (two units in total)
- Alterations and additions$25k
Alt dwg to form bathrm in basement
- Fires and heating$4,000
Install kent Oxford heater in dwg
- Alterations and additions$50k
Remove walls to create open plan kitchen/living area, install beams, create ensuite, construct stairs, convert gge into 3rd bdrm & install metro r1 heater in dwg
- Garages, sheds and carports$30k
Erect gge with laundry tub
- New homes$400k
New dwg with attached gge
- Fires and heating$6,000
Install maxen kinmont 350 heater in dwg
ResidentialCommercial The dots are this page of the list.
Near Concord
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.