Building consents
Building consents in Mornington
Below: 185 consents we hold in Mornington, searchable and on the map.
Consents on record in Mornington
Individual building consents we hold, each on its property: 185 from 1 May 2005 to 1 Sep 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions49
7 in the last 12 months · typically $20k
- Fires and heating25
6 in the last 12 months · typically $5,500
- New homes13
1 in the last 12 months · typically $500k
- Plumbing, drainage and wastewater7
2 in the last 12 months · typically $5,000
- Garages, sheds and carports4
1 in the last 12 months · typically $40k
- Multiple homes4
typically $1.4m
- Decks, pergolas and verandahs3
typically $50k
- Retaining walls2
- Relocated buildings2
typically $75k
- Demolition2
typically $65k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $600kNew dwg with attached gge, construct block retaining wall 35 Meadow Street
- $99kConnect existing dwg to foundations & services & internal alterations 18 Cochrane Street
- $50kInternal alterations to existing dwg 10 Whitby Street
- $35kAlt bathrm in dwg 24 Springhill Road
- $32kShed 15 Havelock Street
185 consents
- Alterations and additions$15k
Convert basement storage room to bathrm in dwg
- New homes$600k
New dwg with attached gge, construct block retaining wall
- Alterations and additions$35k
Alt bathrm in dwg
- Plumbing, drainage and wastewater$9,500
New plumbing & drainage to existing outbuilding - sewer connection
- Alterations and additions$50k
Internal alterations to existing dwg
- Fires and heating$8,000
Install pellet fire in dwg
- Alterations and additions$8,000
Exemption - housing (detached dwg) - install retrofit dry fibre cosywall insulation to external walls
- Alterations and additions$99k
Connect existing dwg to foundations & services & internal alterations
- Fires and heating$3,000
Install solid fuel burner with wetback in dwg.
- Fires and heating$5,000
Install solid fuel burner in dwg
- Fires and heating$5,000
Install solid fuel burner in dwg
- Fires and heating$10k
Install 2 pellet fires in dwg
- Alterations and additions$3,000
Housing (detached dwg) - installation of a replacement freestanding woodburner (metro r2), reuse the existing flue
- Garages, sheds and carports$32k
Shed
- Alterations and additions$15k
251093 - lot 11 - removing the existing external wall of previous entrance & constructing a new exterior wall & installing a new exterior window as part of the revised design. Swimming pool filled & levelled
- Plumbing, drainage and wastewater$3,000
Replace existing foul drainage
- Fires and heating$1
Amendment to aba-2024-1805 - relocate heater within living area of dwg
- New homes$320k
Construction of detached dwg - single storey with 2
- Fires and heating$5,000
Install metro wee rad leg heater in dwg
- Fires and heating$3,000
Install woodsman Brunner mkii heater in dwg
- Relocated buildings$75k
Relocate dwg housing - detached
- Alterations and additions$3,000
Apply waterproofing membrane to bathrm of dwg
- Decks, pergolas and verandahs$50k
Site services, foundations & deck for a transportable detached dwgs
- Garages, sheds and carports$39k
Erect gge
- Alterations and additions$30k
Alt dwg - create open plan kitchen & living
ResidentialCommercial The dots are this page of the list.
Near Mornington
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.