Building consents
Building consents in North East Valley
Below: 267 consents we hold in North East Valley, searchable and on the map.
Consents on record in North East Valley
Individual building consents we hold, each on its property: 267 from 1 Apr 2013 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating31
3 in the last 12 months · typically $6,000
- Alterations and additions29
3 in the last 12 months · typically $12k
- New homes28
7 in the last 12 months · typically $270k
- Plumbing, drainage and wastewater12
3 in the last 12 months · typically $6,500
- Decks, pergolas and verandahs8
1 in the last 12 months · typically $50k
- Garages, sheds and carports6
typically $50k
- Multiple homes5
1 in the last 12 months · typically $495k
- Other new buildings3
3 in the last 12 months · typically $210k
- Demolition3
typically $90k
- Retaining walls2
typically $36k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $300kHouse on site 8 142 North Road
- $225k2-bdrm dwg with multiple cl 142 North Road
- $210kFirst of two, site 3 142 North Road
- $210kSecond house of site 3 142 North Road
- $210kSite 10 142 North Road
267 consents
- Alterations and additions$15k
Convert part kitchen & dining room to enlarge bathrm of dwg
- Fires and heating$7,000
Install solid fuel burner in dwg
- Alterations and additions$100k
Extend dwg to form bdrm
- Fit-outs$20k
Convert dwg into 2 units with inter-tenancy firewall
- Plumbing, drainage and wastewater$15k
Install stormwater drainage
- New homes$225k
2-bdrm dwg with multiple cl
- Alterations and additions$10k
Install wet area shower in dwg
- Fires and heating$5,000
Install solid fuel burner in dwg
- Decks, pergolas and verandahs$200k
Pergola roof & laundry block removal
- Plumbing, drainage and wastewater$5,000
Install foul sewer drainage to separate dwgs for subdivision
- Other new buildings$210k
First of two, site 3
- New homes$210k
Second house of site 3
- New homes$210k
First house of 2 - site 4
- Other new buildings$210k
Site 6
- New homes$300k
House on site 8
- New homes$210k
Site 9 house
- Multiple homes$210k
Second of two houses on site 4
- Other new buildings$210k
Site 10
- New homes$210k
Site 11 house
- New homes$210k
Site 12 house
- New commercial buildings$210k
Factory build - 2-bdrm dwg
- Plumbing, drainage and wastewater$30k
Remove walls to create open plan living/dining room, install toilet in bathrm & maxen kinmont 350 heater in dwg
- Fires and heating$7,000
Install champion ena plus pellet heater in dwg
- Plumbing, drainage and wastewater$20k
Alt internal layout of dwg to create second bathrm, separate toilet & laundry
- Demolition$20k
Demolish existing kitchen & convert dining room into kitchen in dwg
ResidentialCommercial The dots are this page of the list.
Near North East Valley
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.