Building consents
Building consents in Harwood
Below: 21 consents we hold in Harwood, searchable and on the map.
Consents on record in Harwood
Individual building consents we hold, each on its property: 21 from 1 Jan 2014 to 1 Aug 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating6
typically $5,000
- Alterations and additions3
typically $1,000
- Garages, sheds and carports2
typically $73k
- Decks, pergolas and verandahs1
typically $28k
- Plumbing, drainage and wastewater1
typically $4,000
- New homes1
typically $727k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
21 consents
- New homes$727k
New dwg & install septic system
- Fires and heating$6,000
Install freestanding wood burner
- Garages, sheds and carports$45k
Erect gge
- Decks, pergolas and verandahs$28k
Extend dwg to form conservatory over existing deck
- Fires and heating$7,000
Install metro wee rad leg heater in dwg
- Fires and heating$3,000
Install jayline fr300 heater with wetback in dwg
- Fires and heating$5,000
Install metro wee rad plus heater in dwg
- Plumbing, drainage and wastewater$4,000
Replace existing effluent dispersal field
- Fires and heating$5,000
Install metro wee rad legs heater in dwg
- Fires and heating$5,000
Install metro tiny rad legs heater in dwg
- Garages, sheds and carports$100k
Add & alterations to dwg & attached gge - internal layout changes to kitchen & laundry locations, change window to bi-fold door, add bathrm to bdrm 1, removal of lounge wall & enlarge gge door
- Alterations and additions$1,000
Amendment to aba-2022-935 - alt cladding (hardie & thomson earthen bevelbacked to hardie & thomson earthen shiplap on cavity battens)
- Alterations and additions$1,000
Amendment to aba-2022-935 - alt cladding (hardie & thomson earthen bevelbacked to hardie & thomson earthen shiplap on cavity battens)
- Alterations and additions$90k
Extend dwg - extend kitchen, replace internal wall, alt layout of bathrm & laundry, reclad exterior, install gas hot water
- Garages, sheds and carports$1,000
Amendment to aba-2020-1245 - alt drainage & plumbing, change gge design to totalspan gge, install pump chamber
- Garages, sheds and carports$40k
Erect gge
- Relocated buildings$178k
Foundations for relocatable dwg, erect gge & detached bathrm, install rainwater & septic tanks, ...
- Fires and heating$4,000
Remove existing heater & install refurbished ps35 heatilator pellet heater in dwg
- New homes$300k
ERECT DWELLING, INSTALL FREESTANDING METRO WEE RAD WOODBURNER
- New homes
ERECT DWELLING, INSTALL FREESTANDING METRO WEE RAD WOODBURNER
- New homes$250k
ERECT NEW DWELLING, INSTALL BAYVIEW F/S PELLET FIRE IN DWELLING, RELOCATE DOOR ON EXISTING GARAGE, ERECT CARPORT, INSTALL WARMINGTON OUTDOOR FIRE, INSTALL RAINWATER TANK, DEMOLISH EXISTING DWELLING
ResidentialCommercial The dots are this page of the list.
Near Harwood
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.