Building consents
Building consents in Cloverlea
Below: 67 consents we hold in Cloverlea, searchable and on the map.
Consents on record in Cloverlea
Individual building consents we hold, each on its property: 67 from 1 Aug 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions16
3 in the last 12 months · typically $41k
- Fires and heating13
1 in the last 12 months · typically $7,500
- New homes9
5 in the last 12 months · typically $400k
- Garages, sheds and carports5
typically $37k
- Minor dwellings and sleepouts4
2 in the last 12 months · typically $108k
- Commercial alterations2
typically $28k
- Relocated buildings1
typically $30k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $980kRbw - to construct 11 x single level modules to be transported to their permanent site on Waiheke Island. The modules include 4 bedrooms, 3 bathrooms, gym, study, rumpus room, laundry & mudroom. 42 Peters Avenue
- $480kRbw-to construct 4 x single level modules to be transported to their permanent site in Greytown. The modules include kitchen, living, bathrooms, laundry, bedrooms 42 Peters Avenue
- $412k3 bdrm dwg 6 Bendigo Street
- $400kRbw - to construct 4 single level modules to be transported to their permanent site on Waiheke Island. The modules will have kitchen, living, fireplace, 3 by bedrooms, 2 by bathrooms, study. Onsite wo 42 Peters Avenue
- $350k101m2 3 bdrm, 1 bathrm home 15C Tararua Terrace
67 consents
- Fires and heating$8,000
Install metro wee rad woody freestanding wood fire into living room
- Minor dwellings and sleepouts$200k
Rbw - staged 1 of 2 bc - off-site construction of sleepout that includes bdrm, dressing room & ensuite in two sections. Part 2 to include site info, hwc, foundation & roof cladding.
- New homes$350k
101m2 3 bdrm, 1 bathrm home
- Alterations and additions$42k
The removal of shub & vanity, flooring to accommodate level entry shower
- Minor dwellings and sleepouts$10k
Alterations to existing sleepout including new bathrm.
- Alterations and additions$50k
Reframe existing wall oblique linea cladding new door & window units
- New homes$400k
Rbw - to construct 4 single level modules to be transported to their permanent site on Waiheke Island. The modules will have kitchen, living, fireplace, 3 by bedrooms, 2 by bathrooms, study. Onsite wo
- New homes$412k
3 bdrm dwg
- New homes$980k
Rbw - to construct 11 x single level modules to be transported to their permanent site on Waiheke Island. The modules include 4 bedrooms, 3 bathrooms, gym, study, rumpus room, laundry & mudroom.
- New homes$480k
Rbw-to construct 4 x single level modules to be transported to their permanent site in Greytown. The modules include kitchen, living, bathrooms, laundry, bedrooms
- Alterations and additions$40k
Existing dwg new alt & extension.
- Commercial alterations$20k
Home extension encompassing attached, external office only
- Alterations and additions$25k
Change to bathrm layout including a waterproofed shower & new lintels
- Alterations and additions$40k
Existing dwg internal alterations to the kitchen & dining areas
- Garages, sheds and carports$50k
Construct a 9 x 6m versatile gge.
- Fires and heating$8,200
Install a masport Kaituna pedestal fire, flue system & flashing
- Fires and heating$8,300
Install a metro wee rad base freestanding wood fire into lounge.
- Fires and heating$3,000
Install masport wood burning fire r1200pedpack
- Fires and heating$7,500
Install a metro wee rad leg into the lounge room.
- Alterations and additions$45k
Alt to units - fire performance upgrade to minimise fire spread between units
- New homes$350k
Rbw - single level dwg- to construct 3 single level modules to be transported to their permanent site in 54 Panorama Parade Pauanui. The modules will have kitchen, living, fireplace, 2 x bedrooms
- Minor dwellings and sleepouts$200k
Rbw- to construct 1 single level dwg transported to the permanent site in Clevedon. The dwg will have 1 kitchenette, bathrm, open plan studio with sleeping, internal fireplace room.Superst
- Fires and heating$7,800
Installation of masport le4000 insert fire & flue system
- New homes$350k
New 3 bdrm, 2 bath dwg
- Fires and heating$7,000
Installation of a firenzo vision ag freestanding woodfire
ResidentialCommercial The dots are this page of the list.
Near Cloverlea
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.