Building consents
Building consents in Terrace End
Below: 198 consents we hold in Terrace End, searchable and on the map.
Consents on record in Terrace End
Individual building consents we hold, each on its property: 198 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes32
6 in the last 12 months · typically $415k
- Alterations and additions29
4 in the last 12 months · typically $50k
- Fires and heating18
3 in the last 12 months · typically $7,500
- Garages, sheds and carports11
1 in the last 12 months · typically $47k
- Pools and spas4
typically $34k
- Plumbing, drainage and wastewater3
typically $2,000
- Repairs, recladding and strengthening2
1 in the last 12 months · typically $348k
- Minor dwellings and sleepouts2
typically $33k
- Decks, pergolas and verandahs2
typically $54k
- Insulation2
typically $44k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $750kConstruct new 4-bdrm dwg with attached dbl gge. 50 Knowles Street
- $600kConstruct a new 4 bdrm home with attached single gge 382 Ruahine Street
- $575kExternal reclad/joinery upgrade 5 Balcairn Place
- $450kConstruction of a new 3 bdrm dwg (front house) 316 Ruahine Street
- $450kConstruction of a new 3 bdrm dwg with attached single gge 316 Ruahine Street
198 consents
- Alterations and additions$50k
Alt work to an existing 4 bdrm dwg to open up the living/kitchen/dining areas
- Fires and heating$8,000
Install a metro wee rad leg freestanding wood fire into the lounge.
- Alterations and additions$30k
Internal alterations, change locations of bathrm & house alt/additions
- Alterations and additions$20k
Alt to internal bathrm, tiled shower
- New homes$600k
Construct a new 4 bdrm home with attached single gge
- Alterations and additions$100k
Swapping a bdrm with the kitchen to create an open plan kitchen/living
- New homes$750k
Construct new 4-bdrm dwg with attached dbl gge.
- Fires and heating$8,500
Install a metro wee rad base freestanding wood fire into living room.
- Garages, sheds and carports$295k
Extension to front of house, internal alterations + new standalone gge
- Fires and heating$7,500
Install a masport Kaituna wood stacker freestanding wood fire into lounge
- New homes$342k
New dwg
- Repairs, recladding and strengthening$575k
External reclad/joinery upgrade
- New homes$450k
Construction of a new 3 bdrm dwg with attached single gge
- New homes$450k
Construction of a new 3 bdrm dwg with attached single gge
- New homes$450k
Construction of a new 3 bdrm dwg (front house)
- Alterations and additions$25k
Alt to existing dwg to create open plan living, close off existing entry
- Plumbing, drainage and wastewater$40k
Existing dwg internal alterations to bathrm & toilet areas
- Insulation$83k
Install insulation into external walls, move kitchen & bathrm fixtures
- Alterations and additions$128k
Master bdrm add including ensuite & walk in wardrobe
- Garages, sheds and carports$47k
Versatile gge
- Alterations and additions$25k
Alt to existing dwg to change access to the rear of the dw
- Alterations and additions$3,000
Install internal gib lining of existing unlined laundry including installation of new insulation in laundry
- Fires and heating$4,000
Install metro wee rad woodburner to replace existing
- Alterations and additions$35k
Existing dwg internal alterations to the kitchen & laundry areas
- New homes$400k
New 3 bdrm, 2 bathrm dwg with attached single gge.
ResidentialCommercial The dots are this page of the list.
Near Terrace End
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.