Building consents
Building consents in Westbrook
Below: 58 consents we hold in Westbrook, searchable and on the map.
Consents on record in Westbrook
Individual building consents we hold, each on its property: 58 from 1 Aug 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating13
2 in the last 12 months · typically $5,300
- New homes10
typically $425k
- Alterations and additions6
1 in the last 12 months · typically $24k
- Garages, sheds and carports6
typically $65k
- Multiple homes3
1 in the last 12 months · typically $1.4m
- Commercial alterations2
1 in the last 12 months · typically $27k
- Minor dwellings and sleepouts1
1 in the last 12 months · typically $150k
- Plumbing, drainage and wastewater1
typically $20k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.9mRbw - construction of seven dwgs. Units 1-2: three storeys, two bedrooms, family room, 3.5 bathrooms, internal gge. Units 3-6: two storeys, two bedrooms, study, 1.5 baths. Unit 7: two storeys, 12 Amberley Avenue
- $200kRemediation of fire damaged dwg, with internal layout re-configuration 38 Stillwater Place
- $150kConstruction of a 9m x 7.2m gge sleepout. 55 Sutherland Crescent
- $34kServices & foundations (only) for new minor dwg - greenbuilt homes factory stock 21 Otaki Place
- $7,700Install a masport Kaituna leg freestanding wood fire into lounge. 63 Cloverlea Road
58 consents
- Alterations and additions$200k
Remediation of fire damaged dwg, with internal layout re-configuration
- Minor dwellings and sleepouts$150k
Construction of a 9m x 7.2m gge sleepout.
- Fires and heating$5,000
Disconnect of wetback in built woodfire & replacement of new in built woodfire with no wetback
- Multiple homes$2.9m
Rbw - construction of seven dwgs. Units 1-2: three storeys, two bedrooms, family room, 3.5 bathrooms, internal gge. Units 3-6: two storeys, two bedrooms, study, 1.5 baths. Unit 7: two storeys,
- Commercial alterations$34k
Services & foundations (only) for new minor dwg - greenbuilt homes factory stock
- Fires and heating$7,700
Install a masport Kaituna leg freestanding wood fire into lounge.
- Alterations and additions$29k
Removing existing bath & installing new level access shower into existing
- Multiple homes$1.4m
Rbw-(lot 1-3) three new two-storey dwgs, including 4 bedrooms & 3 bathrooms, wc, kitchen, single car gge. New 1.2m max timber retaining walls, 0.6m keystone retaining wall, & private drai
- Multiple homes$786k
Rbw - (lot 4-5) two new two-storey dwgs, including four bedrooms & three bathrooms, wc, kitchen, single car gge. New 1.2m max timber retaining walls, 0.6m keystone retaining wall, & privat
- Fires and heating$4,500
Replace existing with metro eco wee rad on base freestanding woodburner
- Fires and heating$7,800
Installation of masport Kaituna legged freestanding fire, optiflue, flue kit, & flashing
- Garages, sheds and carports$70k
9x6 Versatile gge
- Fires and heating$5,000
Alt to dwg - installation of Masport Hurunui leg (uleb), freestanding, dry, woodburner, cac-234268.
- Fires and heating$5,500
Alt to dwg - installation of a woodsman serene petite, freestanding dry, wood burner cac212697
- Alterations and additions$18k
Internal alt to bathrm removing acrylic / tray shower & replace with level entry tiled shower
- Fires and heating$4,000
Replacing existing fireplace with new fireplace using existing flue hole
- Fires and heating$6,700
Installation of inbuilt solid fuel heating appliance
- Alterations and additions$80k
Alterations to existing residence including removal of existing load-bearing internal walls
- Garages, sheds and carports$90k
Rbw - gge conversion to home occupation kitchen & half to remain as storage. Dbl gge door to be filled in with cladding & two timber french doors.
- Garages, sheds and carports$60k
12.5m long x 9.0m wide dbl gge - hobby room
- Fires and heating$3,514
Installation of freestanding solid fuel heating appliance
- Commercial alterations$20k
Turn existing gge into a rumpus room with a bar. Laundry to have shower & toilet added
- Fires and heating$2,500
Install new wood burner
- Plumbing, drainage and wastewater$20k
Adding plumbing fixture to wc & bathrm
- New homes$400k
New dwg
ResidentialCommercial The dots are this page of the list.
Near Westbrook
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.