Building consents
Building consents in Linton
Below: 68 consents we hold in Linton, searchable and on the map.
Consents on record in Linton
Individual building consents we hold, each on its property: 68 from 1 Aug 2019 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating15
1 in the last 12 months · typically $7,000
- Alterations and additions12
2 in the last 12 months · typically $86k
- New homes7
1 in the last 12 months · typically $600k
- Plumbing, drainage and wastewater5
1 in the last 12 months · typically $18k
- Garages, sheds and carports3
typically $47k
- Relocated buildings3
typically $50k
- Pools and spas3
typically $99k
- Repairs, recladding and strengthening1
typically $30k
- Decks, pergolas and verandahs1
typically $18k
- Minor dwellings and sleepouts1
typically $110k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $600kNew 3 bdrm dwg with attached gge 390 Scotts Road
- $25kNew ensuite & wardrobe within existing dwg. 303 Kahuterawa Road
- $20kInstall a freestanding nectre big bakers oven in dining room of main house 16 Shere Lane
- $18kReplace existing septic tank with new wastewater treatment plant 123 Kahuterawa Road
- $8,200Replacement of solid fuel fire with woodsman Tasman mkii with wetback. 56 Honore Drive
68 consents
- Alterations and additions$25k
New ensuite & wardrobe within existing dwg.
- Plumbing, drainage and wastewater$18k
Replace existing septic tank with new wastewater treatment plant
- New homes$600k
New 3 bdrm dwg with attached gge
- Fires and heating$8,200
Replacement of solid fuel fire with woodsman Tasman mkii with wetback.
- Alterations and additions$20k
Install a freestanding nectre big bakers oven in dining room of main house
- Fires and heating$60k
Re-pile a 4 bdrm, two storey 176.4m2 dwg, replace lounge woodburner
- Fires and heating$14k
Install firenzo kompact deco insert wood fire into existing masonry chimney
- Fires and heating$10k
Install a metro Ltd wee rad base freestanding wood fire into lounge & connect to existing wetabck
- Fires and heating$6,000
Install masport coronet freestandfing solid fuel burner
- Fires and heating$10k
Installation of a yunca monte euro c/air woodfire, flue system & flashing
- Fires and heating$7,000
Install a yunca monte multi fuel free standing wood fire replacing an old fire
- Garages, sheds and carports$45k
Add to existing attached gge
- Fires and heating$5,000
Install new freestanding wood burner, metro r2 with metro eco flue kit
- Alterations and additions$40k
Minor add
- Alterations and additions$350k
To alt the interior of existing dwg to form larger living areas
- Alterations and additions$35k
1. Installation of bracing elements & beam to roof connections
- Fires and heating$5,000
Install new metrofires xtreme rad woodfire
- New homes$450k
4 bdrm dwg
- New homes$440k
Construction of a new 2 bdrm dwg
- Plumbing, drainage and wastewater$11k
Installation of new septic tank system Devan 5.15 as existing has failed
- Fires and heating$16k
Installation of Firenzo Contessa freestanding woodfire & Masport R3000 freestanding woodfire
- Alterations and additions$550k
Extension to existing dwg to form new kitchen/dining/lounge
- Plumbing, drainage and wastewater$50k
Additional plumbing fixtures added to a existing dwg
- Alterations and additions$860k
Additions to existing residence including entry, open-plan living/dining
- Repairs, recladding and strengthening$30k
Retaining wall remedial works
ResidentialCommercial The dots are this page of the list.
Near Linton
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.