Building consents
Building consents in Calton Hill
Below: 97 consents we hold in Calton Hill, searchable and on the map.
Consents on record in Calton Hill
Individual building consents we hold, each on its property: 97 from 1 Oct 2016 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions19
5 in the last 12 months · typically $10k
- Fires and heating17
1 in the last 12 months · typically $5,000
- Multiple homes5
5 in the last 12 months · typically $588k
- Plumbing, drainage and wastewater5
typically $6,000
- New homes3
2 in the last 12 months · typically $253k
- Decks, pergolas and verandahs3
1 in the last 12 months · typically $30k
- Garages, sheds and carports2
typically $63k
- New commercial buildings1
1 in the last 12 months · typically $588k
- Pools and spas1
1 in the last 12 months · typically $66k
- Retaining walls1
1 in the last 12 months · typically $25k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $588kMultiproof - transportable duplex (bs105d55&57) 494 South Road
- $588kMultiproof - transportable duplex (bs105d11&12) 494 South Road
- $588kTransportable - 3 bdrm domestic dwg - factory built 496 South Road
- $588kMultiproof - transportable duplex (bs105d59&61) 494 South Road
- $588kMultiproof - transportable duplex (bs105d2&4) 494 South Road
97 consents
- Fires and heating$5,000
Install solid fuel burner in dwg
- Alterations and additions$25k
Install shower in bathrm, form laundry in basement of dwg
- Alterations and additions$1,000
Amendment to aba-2024-1878 - revise finished floor level & subfloor bracing
- Alterations and additions$1
Transportable - 3 bdrm domestic dwg amendment 1: the main bathrm will be accessible. Changes for amendment include level entry shower with curtain rail, grabrails, non-slip vinyl. Clouded plans provided & product specs. We will be buildin
- Retaining walls$25k
Replace retaining wall
- New homes$331k
Transportable 4 bdrm detached dwg
- Alterations and additions$10k
Amendment to aba-2025-1478 - alt layout of bathrm, install beam & timber pile, window in bdrm & dbl doors in entry
- Alterations and additions$30k
Alt dwg - remove walls & install beams to create open plan kitchen & living room, remove wall to extend bathrm, convert existing living room to bdrm 1 & relocate hwc to linen cupboard
- New commercial buildings$588k
Transportable - 3 bdrm domestic dwg - factory built
- Multiple homes$588k
Multiproof - transportable duplex (bs105d11&12)
- Multiple homes$588k
Multiproof - transportable duplex (bs105d2&4)
- Multiple homes$588k
Multiproof - transportable duplex (bs105d55&57)
- Multiple homes$588k
Multiproof - transportable duplex (bs105d59&61)
- Decks, pergolas and verandahs$30k
Add deck to dwg
- Multiple homes$588k
Multiproof - transportable duplex (oceanabs105)
- Pools and spas$66k
New swimming pool & pool fencing.
- New homes$212k
Transportable dwg
- Plumbing, drainage and wastewater$100k
Alt layout of bathrm & toilet, convert laundry to bdrm 4 & relocate laundry to entry of dwg
- New homes$253k
Transportable dwg (stock97rigby)
- Alterations and additions$2,000
Install sump
- Decks, pergolas and verandahs$8,000
Erect deck
- Alterations and additions$250k
Installation of new perforated aluminium external screens to provide additional shading to windows. New feature aluminium screen at ground level entry. No internal works or work to external envelope.
- Alterations and additions$5,000
Alt dwg - remove wall, install beam
- Fires and heating$5,000
Install masport Wanaka heater in dwg
- Fires and heating$5,000
Install maxen cargill 350 heater in dwg
ResidentialCommercial The dots are this page of the list.
Near Calton Hill
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.