Building consents
Building consents in Clyde Hill
Below: 12 consents we hold in Clyde Hill, searchable and on the map.
Consents on record in Clyde Hill
Individual building consents we hold, each on its property: 12 from 1 Nov 2020 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating4
1 in the last 12 months · typically $5,500
- Alterations and additions1
typically $200k
- Decks, pergolas and verandahs1
typically $25k
- Garages, sheds and carports1
typically $1,500
- Minor dwellings and sleepouts1
typically $50k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $4,000Install solid fuel burner in dwg 8 St Heliers Court
12 consents
- Fires and heating$4,000
Install solid fuel burner in dwg
- Minor dwellings and sleepouts$50k
Alt bathrm of dwg & convert detached gge to sleepout
- Fires and heating$6,067
Install metro tiny rad heater with wetback in dwg
- Garages, sheds and carports$1,500
Alt dwg - relocate laundry from workshop (basement) to bathrm (ground floor)
- Fires and heating$6,000
Install jayline fr400 heater in dwg
- Decks, pergolas and verandahs$25k
Erect deck
- Fires and heating$5,000
Install jayline fr300 heater in dwg
- Alterations and additions$200k
Add to & alt internal layout of dwg
- Alterations and additions$20k
Reduce bdrm 1 to form second bathrm in dwg, replace cladding with stucco
- Fires and heating$6,000
Install masport r3000 heater in dwg
- Decks, pergolas and verandahs$10k
Remove bay window of dwg, fit aluminium joinery & construct deck
- Alterations and additions$18k
Remove internal walls, install beam, infill internal door, convert bdrm 3 to lounge, install freestanding jayline ss200l heater in dwg
ResidentialCommercial The dots are this page of the list.
Near Clyde Hill
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.