Consents on record in Company Bay
Individual building consents we hold, each on its property: 81 from 1 Feb 2013 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating12
2 in the last 12 months · typically $5,000
- Alterations and additions6
1 in the last 12 months · typically $5,000
- New homes6
typically $859k
- Retaining walls2
1 in the last 12 months · typically $6,500
- Decks, pergolas and verandahs2
typically $160k
- Repairs, recladding and strengthening1
typically $25k
- Multiple homes1
typically $263k
- Demolition1
typically $90k
- Commercial alterations1
typically $225k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $10kConstruct retaining walls 112 Mission Cove
- $10kR2 - install solid fuel burner in dwg & construct deck with access stairs 15 Raynbird Street
- $5,000Install solid fuel burner in dwg 24 Raynbird Street
- $1Amendment to aba-2025-1185 - change roof & wall claddings, revise roof framing, wingwalls, flooring & paving level, delete vergola, drainage channels & central heating system 50 Raynbird Street
81 consents
- Retaining walls$10k
Construct retaining walls
- Fires and heating$5,000
Install solid fuel burner in dwg
- Fires and heating$10k
R2 - install solid fuel burner in dwg & construct deck with access stairs
- Alterations and additions$1
Amendment to aba-2025-1185 - change roof & wall claddings, revise roof framing, wingwalls, flooring & paving level, delete vergola, drainage channels & central heating system
- Demolition$90k
Demolish conservatory & extend dwg to create lounge, remove walls & install lintel & beam, tile shower, install metro ambie plus heater & add deck
- Alterations and additions$10k
Install wet-area showers in bathrm & ensuite of dwg
- New homes$1m
New dwg with garages & install water tanks
- New homes$694k
New dwg with attached gge & construct retaining wall
- Fires and heating$8,000
Install metro xtreme rad woody heater in dwg
- Multiple homes$263k
Construct single level one bed dwg (1/2 duplex)
- Repairs, recladding and strengthening$25k
Reclad dwg
- Fires and heating$6,000
Install ravelli elena rv100 pellet fire in dwg
- New homes$950k
New dwg - construct detached gge & retaining walls & install two water tanks, septic system & jayline pro 300 heater
- Fires and heating$3,500
Install Masport Wanaka heater in dwg
- Fires and heating$4,500
Install masport Waimakariri freestanding fire
- Fires and heating$5,000
Install Metro Wee Rad leg heater in dwg
- Fires and heating$8,000
Install Metro Ambie One HT heater in dwg
- Retaining walls$3,000
Amendment to aba-2022-1339 - delete two retaining walls & parking spaces, revise exterior stair design, add ramps & change decking from radiata timber to outdure cassa composite decking
- New homes$478k
New dwg, install metro tiny ped heater, water tanks & connect to existing septic tank with effluent dispersal field
- Alterations and additions$5,000
Alt layout of bathrm & install tiled showers to bathrm & ensuite
- Commercial alterations$225k
Alt dwg - convert basement to living area with bdrm, bathrm, office & storage & install stiltz duo lift
- Fires and heating$5,000
Install jayline spitfire heater in dwg
- New homes$859k
Erect Dwelling with Attached Garage, Erect Retaining Wall
- New homes
Erect Dwelling with Attached Garage, Erect Retaining Wall
- Fires and heating$6,000
Install masport osburn 1600 heater in dwg
ResidentialCommercial The dots are this page of the list.
Near Company Bay
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.