Building consents
Building consents in Kuri Bush
Below: 14 consents we hold in Kuri Bush, searchable and on the map.
Consents on record in Kuri Bush
Individual building consents we hold, each on its property: 14 from 1 Jun 2020 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Garages, sheds and carports4
1 in the last 12 months · typically $55k
- Alterations and additions2
1 in the last 12 months · typically $9,000
- New homes2
1 in the last 12 months · typically $517k
- Plumbing, drainage and wastewater2
typically $19k
- Fires and heating2
typically $7,000
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $719kNew dwg with attached gge, install solid fuel burner with wetback, septic system & water tanks 284 Otokia-Kuri Bush Road East
- $85kErect pole shed & install water tank 389 Big Stone Road
- $12kInstall windows, infill external door of dwg 1331 Taieri Mouth Road
14 consents
- Alterations and additions$12k
Install windows, infill external door of dwg
- New homes$719k
New dwg with attached gge, install solid fuel burner with wetback, septic system & water tanks
- Garages, sheds and carports$85k
Erect pole shed & install water tank
- Fires and heating$7,000
Install woodsman Tasman mkii heater with wet back in dwg
- Alterations and additions$6,000
Alt dwg - install wet-area shower in bathrm
- Plumbing, drainage and wastewater$18k
Replace existing septic tank with effluent dispersal field
- New homes$315k
New dwg, install Woodsman Serene Petite heater, water storage tank & septic system
- Garages, sheds and carports$50k
Erect gge & install sink
- Garages, sheds and carports$3,000
Amendment to aba-2022-1224 - alt design of gge
- Garages, sheds and carports$60k
Erect gge
- Plumbing, drainage and wastewater$20k
Construct pump house with toilet, install water tanks & effluent disposal field
- Fires and heating$7,000
Install masport Rakaia heater in dwg
- Alterations and additions$1
Amendment to aba-2018-923 - alt internal wall
- Commercial alterations$9,000
Amendment to aba-2018-923 - delete additions to ground floor lounge & first floor bedrooms, alt windows w4 & w5, alt door to office, alt beam between lounge & dining & wall on first floor, install yunca wedj 2000 heater with wetback
ResidentialCommercial The dots are this page of the list.
Near Kuri Bush
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.