Building consents
Building consents in Liberton
Below: 73 consents we hold in Liberton, searchable and on the map.
Consents on record in Liberton
Individual building consents we hold, each on its property: 73 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating17
5 in the last 12 months · typically $5,000
- Alterations and additions16
4 in the last 12 months · typically $17k
- New homes5
1 in the last 12 months · typically $500k
- Minor dwellings and sleepouts3
1 in the last 12 months · typically $98k
- Plumbing, drainage and wastewater3
typically $2,000
- Commercial alterations1
1 in the last 12 months · typically $10k
- Other new buildings1
typically $2.4m
- Garages, sheds and carports1
typically $28k
- Insulation1
typically $30k
- Multiple homes1
typically $700k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $519kConstruction of a single level four bdrm detached 28 Hillary Street
- $270kExtend & alt internal layout of dwg, add decks 7 Lowe Street
- $98kExtend sleepout to form bathrm & hobby room 11 Forrester Avenue
- $19kRemove & alt internal walls & doors of dwg 11 Forrester Avenue
- $10kRemove internal wall between living room & proposed kitchen of dwg 31 Hislop Street
73 consents
- Alterations and additions$10k
Remove internal wall between living room & proposed kitchen of dwg
- Alterations and additions$19k
Remove & alt internal walls & doors of dwg
- Commercial alterations$10k
Alt to workshop - unit 2 - add of wc to ground floor
- Fires and heating$5,000
Install solid fuel burner in dwg
- New homes$519k
Construction of a single level four bdrm detached
- Fires and heating$5,000
Install solid fuel burner in dwg
- Alterations and additions$270k
Extend & alt internal layout of dwg, add decks
- Fires and heating$4,000
Install solid fuel burner in dwg
- Fires and heating$8,000
Install solid fuel burner in dwg
- Minor dwellings and sleepouts$98k
Extend sleepout to form bathrm & hobby room
- Fires and heating$2,000
Install solid fuel burner in dwg
- Alterations and additions$1
Amendment 1 - increase scope to include roof structure & change to wetarea linings
- Fires and heating$5,000
Install maxen kinmont 350-l heater in dwg
- Fires and heating$6,000
Install yunca monte base heater in dwg
- Fires and heating$3,200
Installation of a reconditioned yunca multi-fuel
- Alterations and additions$10k
Amendment 1 - approved engineering acceptance letter showing
- Fires and heating$6,000
Install maxen kinmont 350 heater in dwg
- Other new buildings$2.4m
New attached res units
- Multiple homes$700k
Construction of 2 x detached dwgs - single storey
- Minor dwellings and sleepouts$7,000
Install warmington studio stove 14 heater in dwg
- Alterations and additions$20k
Amendment to ABA-2018-1997 - delete window (W01), install sliding door (D06), & construct deck with balustrade
- Fires and heating$5,000
Install Yunca Monte Euro heater in dwg
- Alterations and additions$19k
Rbw. Reconfigure existing laundry room & add shower & vanity.
- Fires and heating$5,000
Install Metro Wee Rad Leg heater in dwg
- Plumbing, drainage and wastewater$40k
Timber cast in concrete foundations, septic & water systems, soak pit & the minimum steps to D1 access for transported dwg.
ResidentialCommercial The dots are this page of the list.
Near Liberton
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.