Building consents
Building consents in Lower Portobello
Below: 11 consents we hold in Lower Portobello, searchable and on the map.
Consents on record in Lower Portobello
Individual building consents we hold, each on its property: 11 from 1 Feb 2020 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Plumbing, drainage and wastewater3
1 in the last 12 months · typically $20k
- Fires and heating3
1 in the last 12 months · typically $6,000
- Minor dwellings and sleepouts1
typically $1
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $20kInstall septic system & effluent field 228 Harington Point Road
- $5,000Install secondhand solid fuel burner in gge 8 Tidewater Drive
11 consents
- Fires and heating$5,000
Install secondhand solid fuel burner in gge
- Plumbing, drainage and wastewater$20k
Install septic system & effluent field
- Plumbing, drainage and wastewater$15k
Install septic system
- Fires and heating$8,000
Install firenzo contessa ag dry heater in dwg
- Minor dwellings and sleepouts$1
Amendment to aba-2017-307 - alt position of studio dwg on-site
- Fires and heating$6,000
Install metro tiny rad woody heater in dwg
- Plumbing, drainage and wastewater$40k
Alt dwg - relocate bathrm & laundry, replace septic tank system, install gas hot water heating
- Alterations and additions$1
Amendment to aba-2020-2229 - alt cladding
- Commercial alterations$360k
Erect gge with workshop, bathrm & sink, install yunca wegj2000 heater, septic tank & & 2 x 30 000l water tanks
- Garages, sheds and carports$32k
Extend gge
- Fires and heating$6,000
Install masport i2000 Bannockburn heater in dwg
ResidentialCommercial The dots are this page of the list.
Near Lower Portobello
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.