Building consents
Building consents in Mount Grand
Below: 13 consents we hold in Mount Grand, searchable and on the map.
Consents on record in Mount Grand
Individual building consents we hold, each on its property: 13 from 1 Mar 2021 to 1 Aug 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions5
typically $30k
- Fires and heating4
typically $6,500
- Garages, sheds and carports2
typically $55k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
13 consents
- Fires and heating$7,000
Install firenzo contessa ag dry heater in dwg
- Fires and heating$7,000
Install metro smart insert heater in dwg
- Alterations and additions$60k
Alt dwg - alt layout to form open plan kitchen, living & dining
- Alterations and additions$20k
Alt dwg - install wet area shower
- Alterations and additions$30k
Alt internal layout of dwg - relocate hot water cylinder, form ensuite & enlarge bathrm
- Garages, sheds and carports$60k
Alt dwg to convert attached gge to bdrm, ensuite & storage, relocate laundry, erect detached gge, install foul water pump & soak pit
- Alterations and additions$10k
Amendment to aba-2019-1733 - change layout of bedrooms, ensuite & wardrobes, delete two windows & revise window dimensions, add toilet to gge, revise bracing & locations of doors & windows & reclad existing gge
- Garages, sheds and carports$50k
Erect pole shed
- Alterations and additions$120k
Alt dwg - extend & alt bdrm 2 to create ensuite & walk-in wardrobe, create new gge with laundry
- Fires and heating$5,000
Install fisher hanmer heater in dwg
- Fires and heating$6,000
Install woodsman serene heater in dwg
- Alterations and additions$25k
Alt dwg - refurbish bathrm, removed internal wall to enlarge ensuite & install cavity slider, change bdrm 2 to wardrobe
- Minor dwellings and sleepouts$25k
Create foundations, connections & relocate family flat to site, install 2 water tanks, connect to existing septic
ResidentialCommercial The dots are this page of the list.
Near Mount Grand
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.