Building consents
Building consents in Normanby
Below: 72 consents we hold in Normanby, searchable and on the map.
Consents on record in Normanby
Individual building consents we hold, each on its property: 72 from 1 Feb 2015 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating19
5 in the last 12 months · typically $6,000
- Alterations and additions12
1 in the last 12 months · typically $12k
- Multiple homes2
typically $1m
- New homes2
typically $555k
- Repairs, recladding and strengthening1
1 in the last 12 months · typically $30k
- Minor dwellings and sleepouts1
typically $10k
- Plumbing, drainage and wastewater1
typically $76k
- Decks, pergolas and verandahs1
typically $450k
- Pools and spas1
typically $60k
- Insulation1
typically $15k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $30kPartial reclad of dwg, install windows, extend entrance, alt bracing 212 Hillingdon Street
- $8,500Install a new freestanding woodburner 38 Antrim Street
- $6,000Install solid fuel burner in dwg 162 Norwood Street
- $6,000Install solid fuel burner with wetback in dwg 3 Ribbonwood Close
- $5,000Remove part wall in kitchen, install bracing & pellet fire in dwg 139 Norwood Street
72 consents
- Fires and heating$6,000
Install solid fuel burner with wetback in dwg
- Fires and heating$5,000
Remove part wall in kitchen, install bracing & pellet fire in dwg
- Fires and heating$8,500
Install a new freestanding woodburner
- Fires and heating$6,000
Install solid fuel burner in dwg
- Repairs, recladding and strengthening$30k
Partial reclad of dwg, install windows, extend entrance, alt bracing
- Alterations and additions$1
Amendment 1 - revised fire design to align with c/as1
- Fires and heating$5,000
Install f/s metro r1 solid fuel burner
- Alterations and additions$6,500
Alt internal layout to create ensuite within bdrm of dwg
- Fires and heating$5,000
Install metro xtreme rad woody heater in dwg
- Multiple homes$1.5m
Construction of five attached dwgs with four attached garages
- Alterations and additions$13k
Rbw remove wall kitchen / laundry
- Fires and heating$7,000
Install metro xtreme rad base heater in dwg
- Decks, pergolas and verandahs$450k
Extend & alt internal layout of dwg & erect deck
- Fires and heating$7,000
Install metro wee rad base heater in dwg
- Pools and spas$60k
Installation of new pool fencing & gate. Fibreglass inground pool over 35,000l
- Alterations and additions$9,000
Alt to dwg - installation of a 'second hand' rika memo 9kw, freestanding dry pellet burner cac144828
- Insulation$15k
Alt internal layout of laundry (wet-area shower) & insulate exterior wall
- Alterations and additions$35k
Alt dwg - apply waterproofing membrane & tiles to bathrm including the bath/shower surrounds
- New homes$686k
New dwg
- Alterations and additions$1
Amendment 1 - changes from original scope of work including change door & window joinery to nk to upvc, wet area wall lining to jh villaboard & alterations to foundation to support bay window
- Fires and heating$5,000
Install refurbished enviro ef2 insert pellet fire in dwg
- Fires and heating$1,000
Install Tropicair Duo heater with wet-back in dwg
- Plumbing, drainage and wastewater$76k
Alt dwg - convert separate toilet to bathrm, create laundry area, install bracing, insulation, toilet & vanity, replace shower with bathtub
- Alterations and additions$150k
Additions & alterations to dwg - add of kitchen/living room, change to layout, re-roof & add of carport
- Alterations and additions$40k
Alt dwg - alt internal layout of bathrm, laundry, kitchen, dining/living, install Woodsman Serene petite heater & convert to gas hot water heating
ResidentialCommercial The dots are this page of the list.
Near Normanby
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.